BYYY BM BD BH EYYY EM ED EH SST SSTANOM HOTSPOT DHW Lat Lon Reef_Name 2000 11 28 02 2000 12 02 03 26.90 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 02 03 2000 12 05 02 26.80 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 05 02 2000 12 09 02 26.60 -1.70 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 09 02 2000 12 12 03 26.50 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 12 03 2000 12 16 02 27.00 -1.30 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 16 02 2000 12 19 00 27.20 -1.10 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 19 00 2000 12 23 02 26.90 -1.30 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 23 02 2000 12 26 03 26.90 -1.30 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 26 03 2000 12 30 02 26.70 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2000 12 30 02 2000 12 31 23 26.70 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 01 13 2001 01 06 03 26.40 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 06 03 2001 01 09 02 26.30 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 13 03 2001 01 16 02 26.10 -2.00 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 16 02 2001 01 20 03 26.30 -1.70 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 20 03 2001 01 23 02 26.00 -2.00 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 23 02 2001 01 27 02 26.00 -1.90 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 27 02 2001 01 30 03 26.20 -1.70 0.00 0.00 0.5 -176.5 Howland and Baker 2001 01 30 03 2001 02 03 02 26.20 -1.70 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 03 02 2001 02 06 03 26.20 -1.60 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 06 03 2001 02 10 02 25.80 -2.00 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 10 02 2001 02 13 02 25.90 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 13 02 2001 02 17 02 25.80 -1.90 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 17 02 2001 02 20 02 25.80 -1.90 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 20 18 2001 02 23 23 25.80 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 23 23 2001 02 27 00 26.50 -1.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 02 27 00 2001 03 02 23 26.60 -1.00 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 02 23 2001 03 05 23 26.70 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 05 23 2001 03 10 00 26.90 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 10 00 2001 03 12 23 26.60 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 12 23 2001 03 16 23 26.90 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 16 23 2001 03 20 00 26.70 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 20 00 2001 03 23 23 26.80 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 23 23 2001 03 27 00 27.30 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 27 00 2001 03 31 00 27.20 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2001 03 31 00 2001 04 02 23 27.20 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 02 23 2001 04 07 00 27.40 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 07 00 2001 04 10 00 27.20 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 10 00 2001 04 13 23 27.30 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 13 23 2001 04 17 00 27.40 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 17 00 2001 04 20 23 27.50 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 20 23 2001 04 23 23 27.70 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 23 23 2001 04 28 00 27.70 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 28 00 2001 04 30 23 27.60 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 04 30 23 2001 05 05 00 27.80 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 05 00 2001 05 08 00 27.70 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 08 00 2001 05 11 23 28.00 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 11 23 2001 05 15 00 28.00 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 15 00 2001 05 19 00 28.00 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 19 00 2001 05 21 23 28.00 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 21 23 2001 05 26 00 28.30 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 26 00 2001 05 28 23 28.50 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2001 05 28 23 2001 06 02 00 28.60 0.40 0.10 0.00 0.5 -176.5 Howland and Baker 2001 06 02 00 2001 06 05 00 28.40 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 05 00 2001 06 08 23 28.10 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 08 23 2001 06 12 00 28.90 0.70 0.40 0.00 0.5 -176.5 Howland and Baker 2001 06 12 00 2001 06 16 00 28.50 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 16 00 2001 06 18 23 28.10 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 18 23 2001 06 23 00 28.60 0.30 0.10 0.00 0.5 -176.5 Howland and Baker 2001 06 23 00 2001 06 26 00 28.40 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 26 00 2001 06 29 23 28.10 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 06 29 23 2001 07 03 00 28.50 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 07 03 00 2001 07 06 23 28.60 0.30 0.10 0.00 0.5 -176.5 Howland and Baker 2001 07 06 23 2001 07 09 23 29.50 1.10 1.00 0.50 0.5 -176.5 Howland and Baker 2001 07 09 23 2001 07 14 00 29.10 0.70 0.60 0.50 0.5 -176.5 Howland and Baker 2001 07 14 00 2001 07 16 23 29.10 0.70 0.60 0.50 0.5 -176.5 Howland and Baker 2001 07 16 23 2001 07 21 00 29.10 0.70 0.60 0.50 0.5 -176.5 Howland and Baker 2001 07 21 00 2001 07 24 00 29.00 0.60 0.50 0.50 0.5 -176.5 Howland and Baker 2001 07 24 00 2001 07 27 23 29.10 0.70 0.60 0.50 0.5 -176.5 Howland and Baker 2001 07 27 23 2001 07 30 23 29.00 0.60 0.50 0.50 0.5 -176.5 Howland and Baker 2001 07 30 23 2001 08 04 00 28.90 0.50 0.40 0.50 0.5 -176.5 Howland and Baker 2001 08 04 00 2001 08 06 23 28.80 0.40 0.30 0.50 0.5 -176.5 Howland and Baker 2001 08 06 23 2001 08 11 00 28.70 0.30 0.20 0.50 0.5 -176.5 Howland and Baker 2001 08 11 00 2001 08 13 23 28.80 0.40 0.30 0.50 0.5 -176.5 Howland and Baker 2001 08 13 23 2001 08 18 00 28.90 0.50 0.40 0.50 0.5 -176.5 Howland and Baker 2001 08 18 00 2001 08 21 07 28.40 0.00 0.00 0.50 0.5 -176.5 Howland and Baker 2001 08 21 07 2001 08 24 23 28.20 -0.20 0.00 0.50 0.5 -176.5 Howland and Baker 2001 08 24 23 2001 08 28 00 29.40 1.00 0.90 0.50 0.5 -176.5 Howland and Baker 2001 08 28 00 2001 09 01 00 28.70 0.20 0.20 0.50 0.5 -176.5 Howland and Baker 2001 09 01 00 2001 09 03 23 29.00 0.50 0.50 0.50 0.5 -176.5 Howland and Baker 2001 09 03 23 2001 09 08 00 29.40 0.90 0.90 0.50 0.5 -176.5 Howland and Baker 2001 09 08 00 2001 09 10 23 29.50 1.00 1.00 1.00 0.5 -176.5 Howland and Baker 2001 09 10 23 2001 09 14 23 29.70 1.20 1.20 1.60 0.5 -176.5 Howland and Baker 2001 09 14 23 2001 09 18 00 29.00 0.50 0.50 1.60 0.5 -176.5 Howland and Baker 2001 09 18 00 2001 09 21 23 29.00 0.50 0.50 1.60 0.5 -176.5 Howland and Baker 2001 09 21 23 2001 09 24 23 29.00 0.50 0.50 1.60 0.5 -176.5 Howland and Baker 2001 09 24 23 2001 09 28 23 28.50 0.00 0.00 1.60 0.5 -176.5 Howland and Baker 2001 09 28 23 2001 10 01 23 28.60 0.20 0.10 1.10 0.5 -176.5 Howland and Baker 2001 10 01 23 2001 10 06 00 28.60 0.20 0.10 1.10 0.5 -176.5 Howland and Baker 2001 10 06 00 2001 10 08 23 28.50 0.10 0.00 1.10 0.5 -176.5 Howland and Baker 2001 10 08 23 2001 10 12 23 28.50 0.10 0.00 1.10 0.5 -176.5 Howland and Baker 2001 10 12 23 2001 10 16 00 28.40 0.00 0.00 1.10 0.5 -176.5 Howland and Baker 2001 10 16 00 2001 10 19 23 28.20 -0.20 0.00 1.10 0.5 -176.5 Howland and Baker 2001 10 19 23 2001 10 22 22 28.20 -0.10 0.00 1.10 0.5 -176.5 Howland and Baker 2001 10 22 22 2001 10 26 23 28.70 0.40 0.20 1.10 0.5 -176.5 Howland and Baker 2001 10 26 23 2001 10 29 23 28.60 0.30 0.10 1.10 0.5 -176.5 Howland and Baker 2001 11 05 11 2001 11 05 23 28.60 0.30 0.10 1.10 0.5 -176.5 Howland and Baker 2001 11 05 23 2001 11 09 23 28.50 0.30 0.00 1.10 0.5 -176.5 Howland and Baker 2001 11 09 23 2001 11 13 00 28.90 0.70 0.40 1.10 0.5 -176.5 Howland and Baker 2001 11 13 00 2001 11 16 23 28.40 0.20 0.00 1.10 0.5 -176.5 Howland and Baker 2001 11 16 23 2001 11 19 23 28.40 0.20 0.00 1.10 0.5 -176.5 Howland and Baker 2001 11 19 23 2001 11 24 00 28.20 0.00 0.00 1.10 0.5 -176.5 Howland and Baker 2001 11 24 00 2001 11 26 23 28.50 0.30 0.00 1.10 0.5 -176.5 Howland and Baker 2001 11 26 23 2001 11 30 22 28.70 0.40 0.20 1.10 0.5 -176.5 Howland and Baker 2001 11 30 22 2001 12 04 00 28.00 -0.30 0.00 0.60 0.5 -176.5 Howland and Baker 2001 12 04 00 2001 12 07 23 27.80 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2001 12 07 23 2001 12 11 00 28.70 0.40 0.20 0.00 0.5 -176.5 Howland and Baker 2001 12 11 00 2001 12 14 23 28.70 0.40 0.20 0.00 0.5 -176.5 Howland and Baker 2001 12 14 23 2001 12 17 23 28.70 0.40 0.20 0.00 0.5 -176.5 Howland and Baker 2001 12 17 23 2001 12 22 00 28.30 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2001 12 22 00 2001 12 24 23 28.40 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 12 24 23 2001 12 29 00 28.40 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2001 12 29 00 2002 01 01 00 28.60 0.40 0.10 0.00 0.5 -176.5 Howland and Baker 2002 01 01 00 2002 01 04 23 28.80 0.60 0.30 0.00 0.5 -176.5 Howland and Baker 2002 01 04 23 2002 01 08 00 29.40 1.30 0.90 0.00 0.5 -176.5 Howland and Baker 2002 01 08 00 2002 01 11 23 29.10 1.00 0.60 0.00 0.5 -176.5 Howland and Baker 2002 01 11 23 2002 01 14 23 29.10 1.00 0.60 0.00 0.5 -176.5 Howland and Baker 2002 01 14 23 2002 01 19 00 29.30 1.30 0.80 0.00 0.5 -176.5 Howland and Baker 2002 01 19 00 2002 01 21 23 29.20 1.20 0.70 0.00 0.5 -176.5 Howland and Baker 2002 01 21 23 2002 01 26 00 29.50 1.50 1.00 0.50 0.5 -176.5 Howland and Baker 2002 01 26 00 2002 01 29 00 29.10 1.20 0.60 0.50 0.5 -176.5 Howland and Baker 2002 01 29 00 2002 02 01 23 29.20 1.30 0.70 0.50 0.5 -176.5 Howland and Baker 2002 02 01 23 2002 02 05 00 29.20 1.40 0.70 0.50 0.5 -176.5 Howland and Baker 2002 02 05 00 2002 02 08 23 28.60 0.80 0.10 0.50 0.5 -176.5 Howland and Baker 2002 02 08 23 2002 02 11 23 28.60 0.90 0.10 0.50 0.5 -176.5 Howland and Baker 2002 02 11 23 2002 02 16 00 28.60 0.90 0.10 0.50 0.5 -176.5 Howland and Baker 2002 02 16 00 2002 02 18 23 28.60 0.90 0.10 0.50 0.5 -176.5 Howland and Baker 2002 02 23 00 2002 02 26 00 28.60 1.00 0.10 0.50 0.5 -176.5 Howland and Baker 2002 03 08 23 2002 03 11 23 28.30 0.80 0.00 0.50 0.5 -176.5 Howland and Baker 2002 03 11 23 2002 03 16 00 28.20 0.70 0.00 0.50 0.5 -176.5 Howland and Baker 2002 03 16 00 2002 03 18 23 28.60 1.10 0.10 0.50 0.5 -176.5 Howland and Baker 2002 03 18 23 2002 03 23 00 28.70 1.10 0.20 0.50 0.5 -176.5 Howland and Baker 2002 03 23 00 2002 03 26 00 28.70 1.10 0.20 0.50 0.5 -176.5 Howland and Baker 2002 03 26 00 2002 03 29 23 28.60 1.00 0.10 0.50 0.5 -176.5 Howland and Baker 2002 03 29 23 2002 04 02 00 28.40 0.80 0.00 0.50 0.5 -176.5 Howland and Baker 2002 04 02 00 2002 04 05 23 28.40 0.80 0.00 0.50 0.5 -176.5 Howland and Baker 2002 04 05 23 2002 04 08 23 28.40 0.70 0.00 0.50 0.5 -176.5 Howland and Baker 2002 04 08 23 2002 04 13 00 28.60 0.90 0.10 0.50 0.5 -176.5 Howland and Baker 2002 04 13 00 2002 04 15 23 28.70 1.00 0.20 0.50 0.5 -176.5 Howland and Baker 2002 04 15 23 2002 04 20 00 28.70 0.90 0.20 0.00 0.5 -176.5 Howland and Baker 2002 04 20 00 2002 04 23 00 29.00 1.20 0.50 0.00 0.5 -176.5 Howland and Baker 2002 04 23 00 2002 04 26 23 29.30 1.40 0.80 0.00 0.5 -176.5 Howland and Baker 2002 04 26 23 2002 04 30 00 29.10 1.20 0.60 0.00 0.5 -176.5 Howland and Baker 2002 04 30 00 2002 05 03 23 29.00 1.00 0.50 0.00 0.5 -176.5 Howland and Baker 2002 05 03 23 2002 05 06 23 28.70 0.70 0.20 0.00 0.5 -176.5 Howland and Baker 2002 05 06 23 2002 05 11 00 28.70 0.70 0.20 0.00 0.5 -176.5 Howland and Baker 2002 05 11 00 2002 05 13 23 29.30 1.20 0.80 0.00 0.5 -176.5 Howland and Baker 2002 05 13 23 2002 05 18 00 29.20 1.10 0.70 0.00 0.5 -176.5 Howland and Baker 2002 05 18 00 2002 05 21 00 29.50 1.40 1.00 0.50 0.5 -176.5 Howland and Baker 2002 05 21 00 2002 05 24 23 29.40 1.30 0.90 0.50 0.5 -176.5 Howland and Baker 2002 05 24 23 2002 05 28 00 29.50 1.40 1.00 1.00 0.5 -176.5 Howland and Baker 2002 05 28 00 2002 05 31 23 29.30 1.10 0.80 1.00 0.5 -176.5 Howland and Baker 2002 05 31 23 2002 06 03 23 29.50 1.30 1.00 1.50 0.5 -176.5 Howland and Baker 2002 06 03 23 2002 06 07 22 29.50 1.30 1.00 2.00 0.5 -176.5 Howland and Baker 2002 06 07 22 2002 06 10 23 29.60 1.40 1.10 2.55 0.5 -176.5 Howland and Baker 2002 06 10 23 2002 06 15 00 29.60 1.40 1.10 3.10 0.5 -176.5 Howland and Baker 2002 06 15 00 2002 06 18 00 29.30 1.10 0.80 3.10 0.5 -176.5 Howland and Baker 2002 06 18 00 2002 06 21 23 29.30 1.10 0.80 3.10 0.5 -176.5 Howland and Baker 2002 06 21 23 2002 06 24 22 29.30 1.00 0.80 3.10 0.5 -176.5 Howland and Baker 2002 06 24 22 2002 06 28 23 29.40 1.10 0.90 3.10 0.5 -176.5 Howland and Baker 2002 06 28 23 2002 07 02 00 29.40 1.10 0.90 3.10 0.5 -176.5 Howland and Baker 2002 07 02 00 2002 07 06 00 29.40 1.10 0.90 3.10 0.5 -176.5 Howland and Baker 2002 07 06 00 2002 07 08 23 29.40 1.00 0.90 3.10 0.5 -176.5 Howland and Baker 2002 07 08 23 2002 07 13 00 29.90 1.50 1.40 3.80 0.5 -176.5 Howland and Baker 2002 07 13 00 2002 07 16 00 29.80 1.40 1.30 4.45 0.5 -176.5 Howland and Baker 2002 07 16 00 2002 07 20 00 30.30 1.90 1.80 5.35 0.5 -176.5 Howland and Baker 2002 07 20 00 2002 07 23 00 30.10 1.70 1.60 6.15 0.5 -176.5 Howland and Baker 2002 07 23 00 2002 07 26 23 30.10 1.70 1.60 6.95 0.5 -176.5 Howland and Baker 2002 07 26 23 2002 07 30 00 30.50 2.10 2.00 7.95 0.5 -176.5 Howland and Baker 2002 07 30 00 2002 08 03 00 30.00 1.60 1.50 8.70 0.5 -176.5 Howland and Baker 2002 08 03 00 2002 08 05 23 30.00 1.60 1.50 9.45 0.5 -176.5 Howland and Baker 2002 08 05 23 2002 08 10 00 29.80 1.40 1.30 10.10 0.5 -176.5 Howland and Baker 2002 08 10 00 2002 08 12 23 29.90 1.50 1.40 10.30 0.5 -176.5 Howland and Baker 2002 08 12 23 2002 08 16 23 29.90 1.50 1.40 11.00 0.5 -176.5 Howland and Baker 2002 08 16 23 2002 08 20 00 29.90 1.50 1.40 11.20 0.5 -176.5 Howland and Baker 2002 08 20 00 2002 08 23 23 29.80 1.40 1.30 11.85 0.5 -176.5 Howland and Baker 2002 08 23 23 2002 08 27 00 29.80 1.40 1.30 12.00 0.5 -176.5 Howland and Baker 2002 08 27 00 2002 08 30 23 30.10 1.60 1.60 12.30 0.5 -176.5 Howland and Baker 2002 08 30 23 2002 09 02 23 30.10 1.60 1.60 12.55 0.5 -176.5 Howland and Baker 2002 09 02 23 2002 09 07 00 29.60 1.10 1.10 12.55 0.5 -176.5 Howland and Baker 2002 09 07 00 2002 09 09 23 29.60 1.10 1.10 13.10 0.5 -176.5 Howland and Baker 2002 09 09 23 2002 09 14 00 29.20 0.70 0.70 13.10 0.5 -176.5 Howland and Baker 2002 09 14 00 2002 09 16 23 29.40 0.90 0.90 13.10 0.5 -176.5 Howland and Baker 2002 09 16 23 2002 09 20 23 30.10 1.60 1.60 13.90 0.5 -176.5 Howland and Baker 2002 09 20 23 2002 09 24 00 29.70 1.20 1.20 14.50 0.5 -176.5 Howland and Baker 2002 09 24 00 2002 09 27 23 29.80 1.30 1.30 15.15 0.5 -176.5 Howland and Baker 2002 09 27 23 2002 10 01 00 30.00 1.60 1.50 15.90 0.5 -176.5 Howland and Baker 2002 10 01 00 2002 10 04 23 29.80 1.40 1.30 15.85 0.5 -176.5 Howland and Baker 2002 10 04 23 2002 10 07 23 29.80 1.40 1.30 15.85 0.5 -176.5 Howland and Baker 2002 10 07 23 2002 10 12 00 29.70 1.30 1.20 15.55 0.5 -176.5 Howland and Baker 2002 10 12 00 2002 10 14 23 29.80 1.40 1.30 15.40 0.5 -176.5 Howland and Baker 2002 10 14 23 2002 10 19 00 29.80 1.40 1.30 15.25 0.5 -176.5 Howland and Baker 2002 10 19 00 2002 10 22 00 29.60 1.20 1.10 14.80 0.5 -176.5 Howland and Baker 2002 10 22 00 2002 10 25 23 29.70 1.40 1.20 14.65 0.5 -176.5 Howland and Baker 2002 10 25 23 2002 10 29 00 30.00 1.70 1.50 14.65 0.5 -176.5 Howland and Baker 2002 10 29 00 2002 11 01 23 29.80 1.50 1.30 14.65 0.5 -176.5 Howland and Baker 2002 11 01 23 2002 11 04 23 29.80 1.50 1.30 14.60 0.5 -176.5 Howland and Baker 2002 11 04 23 2002 11 09 00 30.00 1.80 1.50 14.65 0.5 -176.5 Howland and Baker 2002 11 09 00 2002 11 11 23 30.10 1.90 1.60 14.75 0.5 -176.5 Howland and Baker 2002 11 11 23 2002 11 16 00 30.10 1.90 1.60 14.90 0.5 -176.5 Howland and Baker 2002 11 16 00 2002 11 19 00 30.00 1.80 1.50 15.00 0.5 -176.5 Howland and Baker 2002 11 19 00 2002 11 22 23 30.00 1.80 1.50 14.95 0.5 -176.5 Howland and Baker 2002 11 22 23 2002 11 26 00 29.70 1.50 1.20 14.75 0.5 -176.5 Howland and Baker 2002 11 26 00 2002 11 29 23 29.70 1.50 1.20 14.80 0.5 -176.5 Howland and Baker 2002 11 29 23 2002 12 02 23 29.70 1.40 1.20 14.85 0.5 -176.5 Howland and Baker 2002 12 02 23 2002 12 07 00 29.80 1.50 1.30 15.50 0.5 -176.5 Howland and Baker 2002 12 07 00 2002 12 09 23 30.00 1.70 1.50 16.25 0.5 -176.5 Howland and Baker 2002 12 09 23 2002 12 14 00 30.00 1.70 1.50 16.20 0.5 -176.5 Howland and Baker 2002 12 14 00 2002 12 16 23 29.70 1.40 1.20 16.20 0.5 -176.5 Howland and Baker 2002 12 16 23 2002 12 20 23 30.60 2.30 2.10 16.60 0.5 -176.5 Howland and Baker 2002 12 20 23 2002 12 24 00 29.60 1.40 1.10 16.40 0.5 -176.5 Howland and Baker 2002 12 24 00 2002 12 28 00 29.60 1.40 1.10 16.30 0.5 -176.5 Howland and Baker 2002 12 28 00 2002 12 31 00 29.60 1.40 1.10 16.20 0.5 -176.5 Howland and Baker 2002 12 31 00 2003 01 03 23 29.90 1.70 1.40 16.30 0.5 -176.5 Howland and Baker 2003 01 03 23 2003 01 06 23 29.90 1.70 1.40 16.35 0.5 -176.5 Howland and Baker 2003 01 06 23 2003 01 11 00 29.90 1.80 1.40 16.40 0.5 -176.5 Howland and Baker 2003 01 11 00 2003 01 13 23 30.30 2.20 1.80 16.75 0.5 -176.5 Howland and Baker 2003 01 13 23 2003 01 18 00 30.50 2.40 2.00 17.15 0.5 -176.5 Howland and Baker 2003 01 18 00 2003 01 21 00 30.40 2.40 1.90 17.35 0.5 -176.5 Howland and Baker 2003 01 21 00 2003 01 24 23 30.20 2.20 1.70 17.55 0.5 -176.5 Howland and Baker 2003 01 24 23 2003 01 28 00 30.20 2.30 1.70 17.75 0.5 -176.5 Howland and Baker 2003 01 28 00 2003 01 31 23 30.20 2.30 1.70 17.85 0.5 -176.5 Howland and Baker 2003 01 31 23 2003 02 03 23 30.20 2.40 1.70 17.90 0.5 -176.5 Howland and Baker 2003 02 03 23 2003 02 08 00 29.70 1.90 1.20 17.70 0.5 -176.5 Howland and Baker 2003 02 08 00 2003 02 10 23 29.70 1.90 1.20 17.55 0.5 -176.5 Howland and Baker 2003 02 10 23 2003 02 15 00 30.00 2.30 1.50 17.55 0.5 -176.5 Howland and Baker 2003 02 15 00 2003 02 17 23 29.80 2.10 1.30 17.60 0.5 -176.5 Howland and Baker 2003 02 17 23 2003 02 21 23 29.80 2.10 1.30 17.65 0.5 -176.5 Howland and Baker 2003 02 21 23 2003 02 25 00 29.20 1.60 0.70 17.05 0.5 -176.5 Howland and Baker 2003 02 25 00 2003 02 28 23 29.10 1.50 0.60 16.40 0.5 -176.5 Howland and Baker 2003 02 28 23 2003 03 04 00 29.10 1.50 0.60 15.65 0.5 -176.5 Howland and Baker 2003 03 04 00 2003 03 08 00 29.10 1.60 0.60 14.90 0.5 -176.5 Howland and Baker 2003 03 08 00 2003 03 10 23 29.10 1.60 0.60 14.30 0.5 -176.5 Howland and Baker 2003 03 10 23 2003 03 15 00 28.90 1.40 0.40 13.25 0.5 -176.5 Howland and Baker 2003 03 15 00 2003 03 17 23 28.40 0.90 0.00 12.70 0.5 -176.5 Howland and Baker 2003 03 17 23 2003 03 22 00 28.40 0.90 0.00 12.15 0.5 -176.5 Howland and Baker 2003 03 22 00 2003 03 25 00 28.60 1.00 0.10 11.60 0.5 -176.5 Howland and Baker 2003 03 25 00 2003 03 29 01 28.40 0.80 0.00 10.90 0.5 -176.5 Howland and Baker 2003 03 29 01 2003 04 01 00 28.60 1.00 0.10 10.20 0.5 -176.5 Howland and Baker 2003 04 01 00 2003 04 05 01 28.30 0.70 0.00 9.50 0.5 -176.5 Howland and Baker 2003 04 05 01 2003 04 08 01 28.90 1.20 0.40 8.60 0.5 -176.5 Howland and Baker 2003 04 08 01 2003 04 12 00 28.80 1.10 0.30 7.60 0.5 -176.5 Howland and Baker 2003 04 12 00 2003 04 15 01 28.30 0.60 0.00 6.65 0.5 -176.5 Howland and Baker 2003 04 15 01 2003 04 19 00 28.60 0.80 0.10 5.80 0.5 -176.5 Howland and Baker 2003 04 19 00 2003 04 22 00 28.50 0.70 0.00 4.95 0.5 -176.5 Howland and Baker 2003 04 22 00 2003 04 26 01 28.70 0.90 0.20 4.10 0.5 -176.5 Howland and Baker 2003 04 26 01 2003 04 29 00 28.30 0.40 0.00 3.25 0.5 -176.5 Howland and Baker 2003 04 29 00 2003 05 03 01 27.90 0.00 0.00 2.65 0.5 -176.5 Howland and Baker 2003 05 03 01 2003 05 06 00 28.50 0.50 0.00 2.05 0.5 -176.5 Howland and Baker 2003 05 06 00 2003 05 10 01 28.30 0.30 0.00 1.30 0.5 -176.5 Howland and Baker 2003 05 10 01 2003 05 12 23 28.30 0.20 0.00 0.65 0.5 -176.5 Howland and Baker 2003 05 12 23 2003 05 17 00 28.50 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2003 05 17 00 2003 05 19 23 28.20 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2003 05 19 23 2003 05 24 00 28.70 0.60 0.20 0.00 0.5 -176.5 Howland and Baker 2003 05 24 00 2003 05 27 00 28.80 0.70 0.30 0.00 0.5 -176.5 Howland and Baker 2003 05 27 00 2003 05 31 01 29.20 1.00 0.70 0.00 0.5 -176.5 Howland and Baker 2003 05 31 01 2003 06 03 00 28.70 0.50 0.20 0.00 0.5 -176.5 Howland and Baker 2003 06 03 00 2003 06 06 23 28.30 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2003 06 06 23 2003 06 10 01 28.60 0.40 0.10 0.00 0.5 -176.5 Howland and Baker 2003 06 10 01 2003 06 14 00 28.50 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2003 06 14 00 2003 06 17 01 28.40 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2003 06 17 01 2003 06 21 00 28.70 0.50 0.20 0.00 0.5 -176.5 Howland and Baker 2003 06 21 00 2003 06 24 01 28.60 0.30 0.10 0.00 0.5 -176.5 Howland and Baker 2003 06 24 01 2003 06 28 00 29.10 0.80 0.60 0.00 0.5 -176.5 Howland and Baker 2003 06 28 00 2003 07 01 00 28.80 0.50 0.30 0.00 0.5 -176.5 Howland and Baker 2003 07 01 00 2003 07 05 01 28.70 0.40 0.20 0.00 0.5 -176.5 Howland and Baker 2003 07 05 01 2003 07 08 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 07 08 00 2003 07 12 00 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2003 07 12 00 2003 07 15 01 29.20 0.80 0.70 0.00 0.5 -176.5 Howland and Baker 2003 07 15 01 2003 07 19 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 07 19 00 2003 07 21 23 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 07 21 23 2003 07 26 00 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2003 07 26 00 2003 07 29 00 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2003 07 29 00 2003 08 02 01 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2003 08 02 01 2003 08 05 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 08 05 00 2003 08 08 23 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2003 08 08 23 2003 08 12 00 28.80 0.40 0.30 0.00 0.5 -176.5 Howland and Baker 2003 08 12 00 2003 08 16 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 08 16 00 2003 08 19 01 29.10 0.70 0.60 0.00 0.5 -176.5 Howland and Baker 2003 08 19 01 2003 08 23 00 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2003 08 23 00 2003 08 25 23 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2003 08 25 23 2003 08 30 00 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2003 08 30 00 2003 09 02 00 28.80 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2003 09 02 00 2003 09 06 01 28.80 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2003 09 06 01 2003 09 09 00 29.20 0.70 0.70 0.00 0.5 -176.5 Howland and Baker 2003 09 09 00 2003 09 12 23 28.90 0.40 0.40 0.00 0.5 -176.5 Howland and Baker 2003 09 12 23 2003 09 16 00 28.80 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2003 09 16 00 2003 09 19 23 28.60 0.10 0.10 0.00 0.5 -176.5 Howland and Baker 2003 09 19 23 2003 09 23 01 28.60 0.10 0.10 0.00 0.5 -176.5 Howland and Baker 2003 09 23 01 2003 09 27 00 29.40 0.90 0.90 0.00 0.5 -176.5 Howland and Baker 2003 09 27 00 2003 09 29 23 29.20 0.80 0.70 0.00 0.5 -176.5 Howland and Baker 2003 09 29 23 2003 10 04 00 29.00 0.60 0.50 0.00 0.5 -176.5 Howland and Baker 2003 10 04 00 2003 10 07 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 10 07 00 2003 10 11 00 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2003 10 11 00 2003 10 14 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2003 10 14 00 2003 10 18 01 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2003 10 18 01 2003 10 21 00 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2003 10 21 00 2003 10 25 00 28.80 0.50 0.30 0.00 0.5 -176.5 Howland and Baker 2003 10 25 00 2003 10 28 01 28.70 0.40 0.20 0.00 0.5 -176.5 Howland and Baker 2003 10 28 01 2003 11 01 00 29.70 1.40 1.20 0.60 0.5 -176.5 Howland and Baker 2003 11 01 00 2003 11 03 23 29.70 1.40 1.20 1.20 0.5 -176.5 Howland and Baker 2003 11 03 23 2003 11 08 00 29.20 1.00 0.70 1.20 0.5 -176.5 Howland and Baker 2003 11 08 00 2003 11 11 00 29.10 0.90 0.60 1.20 0.5 -176.5 Howland and Baker 2003 11 11 00 2003 11 15 01 28.90 0.70 0.40 1.20 0.5 -176.5 Howland and Baker 2003 11 15 01 2003 11 18 00 28.90 0.70 0.40 1.20 0.5 -176.5 Howland and Baker 2003 11 18 00 2003 11 21 23 28.80 0.60 0.30 1.20 0.5 -176.5 Howland and Baker 2003 11 21 23 2003 11 25 01 29.00 0.80 0.50 1.20 0.5 -176.5 Howland and Baker 2003 11 25 01 2003 11 29 00 29.20 1.00 0.70 1.20 0.5 -176.5 Howland and Baker 2003 11 29 00 2003 12 01 23 29.00 0.70 0.50 1.20 0.5 -176.5 Howland and Baker 2003 12 01 23 2003 12 06 11 29.00 0.70 0.50 1.20 0.5 -176.5 Howland and Baker 2003 12 06 11 2003 12 09 06 28.50 0.20 0.00 1.20 0.5 -176.5 Howland and Baker 2003 12 09 06 2003 12 13 00 29.30 1.00 0.80 1.20 0.5 -176.5 Howland and Baker 2003 12 13 00 2003 12 16 00 28.80 0.50 0.30 1.20 0.5 -176.5 Howland and Baker 2003 12 16 00 2003 12 20 01 28.80 0.50 0.30 1.20 0.5 -176.5 Howland and Baker 2003 12 20 01 2003 12 23 00 28.80 0.60 0.30 1.20 0.5 -176.5 Howland and Baker 2003 12 23 00 2003 12 26 23 28.30 0.10 0.00 1.20 0.5 -176.5 Howland and Baker 2003 12 26 23 2003 12 29 23 28.70 0.50 0.20 1.20 0.5 -176.5 Howland and Baker 2003 12 29 23 2004 01 03 00 28.90 0.70 0.40 1.20 0.5 -176.5 Howland and Baker 2004 01 03 00 2004 01 05 23 28.90 0.70 0.40 1.20 0.5 -176.5 Howland and Baker 2004 01 05 23 2004 01 10 00 28.60 0.50 0.10 1.20 0.5 -176.5 Howland and Baker 2004 01 10 00 2004 01 13 00 28.70 0.60 0.20 1.20 0.5 -176.5 Howland and Baker 2004 01 13 00 2004 01 17 00 28.60 0.50 0.10 1.20 0.5 -176.5 Howland and Baker 2004 01 17 00 2004 01 20 00 28.60 0.60 0.10 1.20 0.5 -176.5 Howland and Baker 2004 01 20 00 2004 01 23 23 28.80 0.80 0.30 0.60 0.5 -176.5 Howland and Baker 2004 01 23 23 2004 01 27 00 28.90 1.00 0.40 0.00 0.5 -176.5 Howland and Baker 2004 01 27 00 2004 01 31 01 28.60 0.70 0.10 0.00 0.5 -176.5 Howland and Baker 2004 01 31 01 2004 02 03 01 28.60 0.70 0.10 0.00 0.5 -176.5 Howland and Baker 2004 02 03 01 2004 02 07 00 28.50 0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 07 00 2004 02 09 20 28.50 0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 09 20 2004 02 14 00 28.00 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 14 00 2004 02 17 00 27.60 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 17 00 2004 02 21 01 27.80 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 21 01 2004 02 24 00 27.50 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 24 00 2004 02 27 23 27.90 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 02 27 23 2004 03 02 01 27.90 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 02 01 2004 03 06 00 27.90 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 06 00 2004 03 08 23 27.90 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 08 23 2004 03 13 00 27.90 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 13 00 2004 03 16 00 27.40 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 16 00 2004 03 20 00 27.90 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 20 00 2004 03 23 00 27.90 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 23 00 2004 03 26 11 27.90 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 03 26 11 2004 03 30 00 28.70 1.10 0.20 0.00 0.5 -176.5 Howland and Baker 2004 03 30 00 2004 04 03 01 28.30 0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 03 01 2004 04 06 01 28.30 0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 06 01 2004 04 10 00 28.30 0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 10 00 2004 04 12 22 28.20 0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 12 22 2004 04 17 00 28.50 0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 17 00 2004 04 20 00 28.30 0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 20 00 2004 04 24 01 28.60 0.80 0.10 0.00 0.5 -176.5 Howland and Baker 2004 04 24 01 2004 04 27 00 28.50 0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2004 04 27 00 2004 05 01 01 28.40 0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2004 05 01 01 2004 05 04 00 28.60 0.60 0.10 0.00 0.5 -176.5 Howland and Baker 2004 05 04 00 2004 05 08 00 28.50 0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2004 05 08 00 2004 05 11 01 28.80 0.80 0.30 0.00 0.5 -176.5 Howland and Baker 2004 05 11 01 2004 05 15 00 28.70 0.60 0.20 0.00 0.5 -176.5 Howland and Baker 2004 05 15 00 2004 05 17 23 28.50 0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2004 05 17 23 2004 05 22 00 28.80 0.70 0.30 0.00 0.5 -176.5 Howland and Baker 2004 05 22 00 2004 05 25 00 28.90 0.80 0.40 0.00 0.5 -176.5 Howland and Baker 2004 05 25 00 2004 05 29 01 29.20 1.10 0.70 0.00 0.5 -176.5 Howland and Baker 2004 05 29 01 2004 06 01 00 28.90 0.70 0.40 0.00 0.5 -176.5 Howland and Baker 2004 06 01 00 2004 06 05 01 28.90 0.70 0.40 0.00 0.5 -176.5 Howland and Baker 2004 06 05 01 2004 06 08 01 28.90 0.70 0.40 0.00 0.5 -176.5 Howland and Baker 2004 06 08 01 2004 06 12 00 28.80 0.60 0.30 0.00 0.5 -176.5 Howland and Baker 2004 06 12 00 2004 06 15 01 28.50 0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2004 06 15 01 2004 06 19 00 29.00 0.80 0.50 0.00 0.5 -176.5 Howland and Baker 2004 06 19 00 2004 06 22 00 29.00 0.80 0.50 0.00 0.5 -176.5 Howland and Baker 2004 06 22 00 2004 06 26 00 29.10 0.80 0.60 0.00 0.5 -176.5 Howland and Baker 2004 06 26 00 2004 06 29 02 29.10 0.80 0.60 0.00 0.5 -176.5 Howland and Baker 2004 06 29 02 2004 07 03 01 29.60 1.30 1.10 0.55 0.5 -176.5 Howland and Baker 2004 07 03 01 2004 07 06 00 29.50 1.20 1.00 1.05 0.5 -176.5 Howland and Baker 2004 07 06 00 2004 07 10 01 29.40 1.00 0.90 1.05 0.5 -176.5 Howland and Baker 2004 07 10 01 2004 07 13 01 29.80 1.40 1.30 1.70 0.5 -176.5 Howland and Baker 2004 07 13 01 2004 07 17 02 29.70 1.30 1.20 2.30 0.5 -176.5 Howland and Baker 2004 07 17 02 2004 07 20 01 29.70 1.30 1.20 2.90 0.5 -176.5 Howland and Baker 2004 07 20 01 2004 07 24 00 29.90 1.50 1.40 3.60 0.5 -176.5 Howland and Baker 2004 07 24 00 2004 07 27 00 29.90 1.50 1.40 4.30 0.5 -176.5 Howland and Baker 2004 07 27 00 2004 07 31 01 29.90 1.50 1.40 5.00 0.5 -176.5 Howland and Baker 2004 07 31 01 2004 08 03 00 29.60 1.20 1.10 5.55 0.5 -176.5 Howland and Baker 2004 08 03 00 2004 08 07 01 29.60 1.20 1.10 6.10 0.5 -176.5 Howland and Baker 2004 08 07 01 2004 08 10 00 29.60 1.20 1.10 6.65 0.5 -176.5 Howland and Baker 2004 08 10 00 2004 08 14 01 29.40 1.00 0.90 6.65 0.5 -176.5 Howland and Baker 2004 08 14 01 2004 08 17 01 29.40 1.00 0.90 6.65 0.5 -176.5 Howland and Baker 2004 08 17 01 2004 08 21 00 29.30 0.90 0.80 6.65 0.5 -176.5 Howland and Baker 2004 08 21 00 2004 08 24 01 29.40 1.00 0.90 6.65 0.5 -176.5 Howland and Baker 2004 08 24 01 2004 08 28 00 29.50 1.10 1.00 7.15 0.5 -176.5 Howland and Baker 2004 08 28 00 2004 08 31 01 29.50 1.00 1.00 7.65 0.5 -176.5 Howland and Baker 2004 08 31 01 2004 09 04 00 29.80 1.30 1.30 8.30 0.5 -176.5 Howland and Baker 2004 09 04 00 2004 09 07 00 29.80 1.30 1.30 8.95 0.5 -176.5 Howland and Baker 2004 09 07 00 2004 09 11 01 30.00 1.50 1.50 9.70 0.5 -176.5 Howland and Baker 2004 09 11 01 2004 09 14 00 29.50 1.00 1.00 10.20 0.5 -176.5 Howland and Baker 2004 09 14 00 2004 09 18 01 29.50 1.00 1.00 10.70 0.5 -176.5 Howland and Baker 2004 09 18 01 2004 09 21 01 29.80 1.30 1.30 11.35 0.5 -176.5 Howland and Baker 2004 09 21 01 2004 09 25 00 29.60 1.10 1.10 11.35 0.5 -176.5 Howland and Baker 2004 09 25 00 2004 09 27 23 30.00 1.50 1.50 11.60 0.5 -176.5 Howland and Baker 2004 09 27 23 2004 10 01 22 29.60 1.20 1.10 12.15 0.5 -176.5 Howland and Baker 2004 10 01 22 2004 10 05 00 29.50 1.10 1.00 12.00 0.5 -176.5 Howland and Baker 2004 10 05 00 2004 10 09 00 29.30 0.90 0.80 11.40 0.5 -176.5 Howland and Baker 2004 10 09 00 2004 10 12 00 29.00 0.60 0.50 10.80 0.5 -176.5 Howland and Baker 2004 10 12 00 2004 10 16 01 29.30 0.90 0.80 10.10 0.5 -176.5 Howland and Baker 2004 10 16 01 2004 10 19 00 29.30 0.90 0.80 9.40 0.5 -176.5 Howland and Baker 2004 10 19 00 2004 10 22 23 29.40 1.10 0.90 8.70 0.5 -176.5 Howland and Baker 2004 10 22 23 2004 10 26 00 29.70 1.40 1.20 8.75 0.5 -176.5 Howland and Baker 2004 10 26 00 2004 10 30 00 29.40 1.10 0.90 8.20 0.5 -176.5 Howland and Baker 2004 10 30 00 2004 11 02 01 29.60 1.30 1.10 8.20 0.5 -176.5 Howland and Baker 2004 11 02 01 2004 11 06 00 29.40 1.10 0.90 8.20 0.5 -176.5 Howland and Baker 2004 11 06 00 2004 11 08 23 29.10 0.90 0.60 8.20 0.5 -176.5 Howland and Baker 2004 11 08 23 2004 11 13 00 29.10 0.90 0.60 8.20 0.5 -176.5 Howland and Baker 2004 11 13 00 2004 11 16 00 29.20 1.00 0.70 8.20 0.5 -176.5 Howland and Baker 2004 11 16 00 2004 11 20 01 29.70 1.50 1.20 8.30 0.5 -176.5 Howland and Baker 2004 11 20 01 2004 11 23 00 29.50 1.30 1.00 8.30 0.5 -176.5 Howland and Baker 2004 11 23 00 2004 11 27 01 29.50 1.30 1.00 8.15 0.5 -176.5 Howland and Baker 2004 11 27 01 2004 11 30 00 29.10 0.90 0.60 7.50 0.5 -176.5 Howland and Baker 2004 11 30 00 2004 12 04 00 29.20 0.90 0.70 6.75 0.5 -176.5 Howland and Baker 2004 12 04 00 2004 12 07 01 29.60 1.30 1.10 6.80 0.5 -176.5 Howland and Baker 2004 12 07 01 2004 12 11 00 29.30 1.00 0.80 6.30 0.5 -176.5 Howland and Baker 2004 12 11 00 2004 12 14 01 29.30 1.00 0.80 5.65 0.5 -176.5 Howland and Baker 2004 12 14 01 2004 12 18 00 29.20 0.90 0.70 5.10 0.5 -176.5 Howland and Baker 2004 12 18 00 2004 12 21 00 29.00 0.70 0.50 4.35 0.5 -176.5 Howland and Baker 2004 12 21 00 2004 12 25 01 29.60 1.40 1.10 4.35 0.5 -176.5 Howland and Baker 2004 12 25 01 2004 12 28 00 29.50 1.30 1.00 4.35 0.5 -176.5 Howland and Baker 2004 12 28 00 2005 01 01 01 29.00 0.80 0.50 4.35 0.5 -176.5 Howland and Baker 2005 01 01 01 2005 01 04 00 29.30 1.10 0.80 4.35 0.5 -176.5 Howland and Baker 2005 01 04 00 2005 01 08 00 29.30 1.20 0.80 4.35 0.5 -176.5 Howland and Baker 2005 01 08 00 2005 01 11 01 29.30 1.20 0.80 4.35 0.5 -176.5 Howland and Baker 2005 01 11 01 2005 01 15 00 29.10 1.00 0.60 4.35 0.5 -176.5 Howland and Baker 2005 01 15 00 2005 01 18 01 28.60 0.50 0.10 3.75 0.5 -176.5 Howland and Baker 2005 01 18 01 2005 01 22 00 29.00 1.00 0.50 3.75 0.5 -176.5 Howland and Baker 2005 01 22 00 2005 01 25 02 29.00 1.00 0.50 3.20 0.5 -176.5 Howland and Baker 2005 01 25 02 2005 01 29 01 29.10 1.20 0.60 3.20 0.5 -176.5 Howland and Baker 2005 01 29 01 2005 02 01 00 29.00 1.10 0.50 3.20 0.5 -176.5 Howland and Baker 2005 02 01 00 2005 02 04 23 28.40 0.60 0.00 3.20 0.5 -176.5 Howland and Baker 2005 02 04 23 2005 02 08 00 28.70 0.90 0.20 3.20 0.5 -176.5 Howland and Baker 2005 02 08 00 2005 02 12 01 28.70 1.00 0.20 2.60 0.5 -176.5 Howland and Baker 2005 02 12 01 2005 02 15 01 28.70 1.00 0.20 2.10 0.5 -176.5 Howland and Baker 2005 02 15 01 2005 02 19 02 28.70 1.00 0.20 1.60 0.5 -176.5 Howland and Baker 2005 02 19 02 2005 02 22 01 28.70 1.00 0.20 1.60 0.5 -176.5 Howland and Baker 2005 02 22 01 2005 02 26 01 29.10 1.50 0.60 1.60 0.5 -176.5 Howland and Baker 2005 02 26 01 2005 03 01 02 29.10 1.50 0.60 1.05 0.5 -176.5 Howland and Baker 2005 03 01 02 2005 03 05 01 29.20 1.60 0.70 1.05 0.5 -176.5 Howland and Baker 2005 03 05 01 2005 03 08 00 29.10 1.60 0.60 1.05 0.5 -176.5 Howland and Baker 2005 03 08 00 2005 03 11 23 28.90 1.40 0.40 1.05 0.5 -176.5 Howland and Baker 2005 03 11 23 2005 03 15 01 29.40 1.90 0.90 1.05 0.5 -176.5 Howland and Baker 2005 03 15 01 2005 03 19 00 28.70 1.20 0.20 0.50 0.5 -176.5 Howland and Baker 2005 03 19 00 2005 03 22 01 28.50 0.95 0.00 0.00 0.5 -176.5 Howland and Baker 2005 03 22 01 2005 03 26 00 28.40 0.83 0.00 0.00 0.5 -176.5 Howland and Baker 2005 03 26 00 2005 03 29 01 28.50 0.91 0.00 0.00 0.5 -176.5 Howland and Baker 2005 03 29 01 2005 04 02 01 28.50 0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2005 04 02 01 2005 04 05 00 28.40 0.76 0.00 0.00 0.5 -176.5 Howland and Baker 2005 04 05 00 2005 04 09 01 28.70 1.04 0.20 0.00 0.5 -176.5 Howland and Baker 2005 04 09 01 2005 04 12 00 28.70 1.02 0.20 0.00 0.5 -176.5 Howland and Baker 2005 04 12 00 2005 04 16 01 28.80 1.09 0.30 0.00 0.5 -176.5 Howland and Baker 2005 04 16 01 2005 04 19 01 28.80 1.05 0.30 0.00 0.5 -176.5 Howland and Baker 2005 04 19 01 2005 04 23 02 28.30 0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2005 04 23 02 2005 04 26 01 28.60 0.75 0.10 0.00 0.5 -176.5 Howland and Baker 2005 04 26 01 2005 04 30 00 28.60 0.70 0.10 0.00 0.5 -176.5 Howland and Baker 2005 04 30 00 2005 05 03 01 28.60 0.66 0.10 0.00 0.5 -176.5 Howland and Baker 2005 05 03 01 2005 05 07 01 28.30 0.31 0.00 0.00 0.5 -176.5 Howland and Baker 2005 05 07 01 2005 05 10 02 28.30 0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2005 05 10 02 2005 05 14 01 28.40 0.31 0.00 0.00 0.5 -176.5 Howland and Baker 2005 05 14 01 2005 05 17 00 28.70 0.59 0.20 0.00 0.5 -176.5 Howland and Baker 2005 05 17 00 2005 05 21 00 28.70 0.58 0.20 0.00 0.5 -176.5 Howland and Baker 2005 05 21 00 2005 05 24 01 29.00 0.87 0.50 0.00 0.5 -176.5 Howland and Baker 2005 05 24 01 2005 05 28 00 29.00 0.86 0.50 0.00 0.5 -176.5 Howland and Baker 2005 05 28 00 2005 05 31 01 29.00 0.85 0.50 0.00 0.5 -176.5 Howland and Baker 2005 05 31 01 2005 06 04 02 28.80 0.64 0.30 0.00 0.5 -176.5 Howland and Baker 2005 06 04 02 2005 06 07 00 29.00 0.83 0.50 0.00 0.5 -176.5 Howland and Baker 2005 06 07 00 2005 06 11 01 29.10 0.91 0.60 0.00 0.5 -176.5 Howland and Baker 2005 06 11 01 2005 06 14 02 29.30 1.10 0.80 0.00 0.5 -176.5 Howland and Baker 2005 06 14 02 2005 06 18 01 29.20 0.98 0.70 0.00 0.5 -176.5 Howland and Baker 2005 06 18 01 2005 06 21 00 28.90 0.66 0.40 0.00 0.5 -176.5 Howland and Baker 2005 06 21 00 2005 06 25 01 29.20 0.93 0.70 0.00 0.5 -176.5 Howland and Baker 2005 06 25 01 2005 06 28 01 28.90 0.61 0.40 0.00 0.5 -176.5 Howland and Baker 2005 06 28 01 2005 07 02 02 29.10 0.79 0.60 0.00 0.5 -176.5 Howland and Baker 2005 07 02 02 2005 07 05 01 29.00 0.67 0.50 0.00 0.5 -176.5 Howland and Baker 2005 07 05 01 2005 07 09 02 28.90 0.54 0.40 0.00 0.5 -176.5 Howland and Baker 2005 07 09 02 2005 07 12 01 29.20 0.82 0.70 0.00 0.5 -176.5 Howland and Baker 2005 07 12 01 2005 07 16 01 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2005 07 16 01 2005 07 19 00 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2005 07 19 00 2005 07 23 01 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2005 07 23 01 2005 07 26 00 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2005 07 26 00 2005 07 30 01 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2005 07 30 01 2005 08 02 01 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 02 01 2005 08 06 02 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 06 02 2005 08 09 01 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 09 01 2005 08 13 00 28.00 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 13 00 2005 08 16 01 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 16 01 2005 08 20 01 28.20 -0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 20 01 2005 08 22 23 28.30 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2005 08 22 23 2005 08 27 00 28.60 0.16 0.10 0.00 0.5 -176.5 Howland and Baker 2005 08 27 00 2005 08 30 00 28.70 0.25 0.20 0.00 0.5 -176.5 Howland and Baker 2005 08 30 00 2005 09 02 23 28.60 0.14 0.10 0.00 0.5 -176.5 Howland and Baker 2005 09 02 23 2005 09 06 00 28.60 0.13 0.10 0.00 0.5 -176.5 Howland and Baker 2005 09 06 00 2005 09 09 22 28.30 -0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 09 22 2005 09 12 23 28.30 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 12 23 2005 09 17 00 28.20 -0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 17 00 2005 09 19 23 28.20 -0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 19 23 2005 09 23 23 28.00 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 23 23 2005 09 27 00 28.40 -0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 27 00 2005 09 30 23 28.20 -0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2005 09 30 23 2005 10 04 00 28.20 -0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2005 10 04 00 2005 10 08 00 28.60 0.18 0.10 0.00 0.5 -176.5 Howland and Baker 2005 10 08 00 2005 10 10 23 28.40 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2005 10 10 23 2005 10 14 23 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2005 10 14 23 2005 10 18 00 28.50 0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2005 10 18 00 2005 10 22 01 28.60 0.25 0.10 0.00 0.5 -176.5 Howland and Baker 2005 10 22 01 2005 10 25 00 28.60 0.26 0.10 0.00 0.5 -176.5 Howland and Baker 2005 10 25 00 2005 10 28 23 29.00 0.68 0.50 0.00 0.5 -176.5 Howland and Baker 2005 10 28 23 2005 11 01 01 28.80 0.51 0.30 0.00 0.5 -176.5 Howland and Baker 2005 11 01 01 2005 11 05 00 28.50 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 05 00 2005 11 08 00 28.00 -0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 08 00 2005 11 11 23 27.70 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 11 23 2005 11 14 22 28.10 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 14 22 2005 11 18 23 28.40 0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 18 23 2005 11 22 05 28.10 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 22 05 2005 11 26 00 28.30 0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 26 00 2005 11 28 23 28.20 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2005 11 28 23 2005 12 03 05 28.20 -0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 03 05 2005 12 06 00 28.30 0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 06 00 2005 12 09 23 28.30 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 09 23 2005 12 13 05 28.30 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 13 05 2005 12 17 00 27.90 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 17 00 2005 12 19 23 27.50 -0.77 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 19 23 2005 12 24 00 27.90 -0.34 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 24 00 2005 12 27 00 27.60 -0.62 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 27 00 2005 12 30 21 27.20 -1.00 0.00 0.00 0.5 -176.5 Howland and Baker 2005 12 30 21 2006 01 03 00 26.70 -1.48 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 03 00 2006 01 07 00 27.10 -1.05 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 07 00 2006 01 10 01 27.20 -0.93 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 10 01 2006 01 14 00 27.20 -0.91 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 14 00 2006 01 16 23 27.20 -0.89 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 16 23 2006 01 21 05 27.00 -1.02 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 21 05 2006 01 24 00 26.90 -1.08 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 24 00 2006 01 27 23 26.60 -1.34 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 27 23 2006 01 31 05 25.80 -2.09 0.00 0.00 0.5 -176.5 Howland and Baker 2006 01 31 05 2006 02 04 00 26.50 -1.33 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 04 00 2006 02 06 23 26.30 -1.51 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 06 23 2006 02 10 23 26.30 -1.45 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 10 23 2006 02 14 00 26.50 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 14 00 2006 02 18 01 26.50 -1.17 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 18 01 2006 02 20 23 26.80 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 20 23 2006 02 25 00 26.50 -1.12 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 25 00 2006 02 28 01 26.50 -1.10 0.00 0.00 0.5 -176.5 Howland and Baker 2006 02 28 01 2006 03 04 00 26.30 -1.28 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 04 00 2006 03 07 00 26.50 -1.06 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 07 00 2006 03 11 04 26.70 -0.83 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 11 04 2006 03 14 00 26.90 -0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 14 00 2006 03 17 23 26.80 -0.71 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 17 23 2006 03 21 05 26.70 -0.84 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 21 05 2006 03 25 00 27.20 -0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 25 00 2006 03 27 23 27.30 -0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2006 03 27 23 2006 04 01 05 27.10 -0.51 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 01 05 2006 04 04 00 27.30 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 04 00 2006 04 07 23 27.20 -0.45 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 07 23 2006 04 11 00 27.20 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 11 00 2006 04 15 00 27.50 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 15 00 2006 04 17 23 27.40 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 17 23 2006 04 22 00 27.50 -0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 22 00 2006 04 25 00 27.70 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 25 00 2006 04 29 01 27.50 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2006 04 29 01 2006 05 02 00 27.70 -0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 02 00 2006 05 06 00 27.70 -0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 06 00 2006 05 08 23 28.00 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 08 23 2006 05 13 00 28.00 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 13 00 2006 05 16 00 28.90 0.80 0.40 0.00 0.5 -176.5 Howland and Baker 2006 05 16 00 2006 05 19 23 28.70 0.59 0.20 0.00 0.5 -176.5 Howland and Baker 2006 05 19 23 2006 05 23 00 28.40 0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 23 00 2006 05 26 23 28.10 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 26 23 2006 05 29 23 28.10 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2006 05 29 23 2006 06 03 00 28.60 0.44 0.10 0.00 0.5 -176.5 Howland and Baker 2006 06 03 00 2006 06 05 23 28.50 0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2006 06 05 23 2006 06 10 00 28.50 0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2006 06 10 00 2006 06 13 00 28.70 0.51 0.20 0.00 0.5 -176.5 Howland and Baker 2006 06 13 00 2006 06 16 23 28.70 0.49 0.20 0.00 0.5 -176.5 Howland and Baker 2006 06 16 23 2006 06 20 00 28.90 0.67 0.40 0.00 0.5 -176.5 Howland and Baker 2006 06 20 00 2006 06 24 00 28.70 0.44 0.20 0.00 0.5 -176.5 Howland and Baker 2006 06 24 00 2006 06 27 01 28.70 0.42 0.20 0.00 0.5 -176.5 Howland and Baker 2006 06 27 01 2006 07 01 00 28.70 0.39 0.20 0.00 0.5 -176.5 Howland and Baker 2006 06 27 01 2006 07 01 00 28.70 0.39 0.20 0.00 0.5 -176.5 Howland and Baker 2006 07 01 00 2006 07 04 00 28.50 0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2006 07 04 00 2006 07 07 23 28.30 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2006 07 07 23 2006 07 11 00 28.60 0.23 0.10 0.00 0.5 -176.5 Howland and Baker 2006 07 11 00 2006 07 15 01 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2006 07 15 01 2006 07 18 01 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2006 07 18 01 2006 07 22 00 28.80 0.40 0.30 0.00 0.5 -176.5 Howland and Baker 2006 07 22 00 2006 07 24 23 29.10 0.70 0.60 0.00 0.5 -176.5 Howland and Baker 2006 07 24 23 2006 07 28 23 29.30 0.90 0.80 0.00 0.5 -176.5 Howland and Baker 2006 07 28 23 2006 08 01 00 29.30 0.90 0.80 0.00 0.5 -176.5 Howland and Baker 2006 08 01 00 2006 08 05 01 29.00 0.60 0.50 0.00 0.5 -176.5 Howland and Baker 2006 08 05 01 2006 08 07 23 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2006 08 07 23 2006 08 12 00 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2006 08 12 00 2006 08 15 01 28.80 0.40 0.30 0.00 0.5 -176.5 Howland and Baker 2006 08 15 01 2006 08 19 00 29.80 1.39 1.30 0.65 0.5 -176.5 Howland and Baker 2006 08 19 00 2006 08 22 00 29.70 1.28 1.20 1.25 0.5 -176.5 Howland and Baker 2006 08 22 00 2006 08 25 23 29.70 1.27 1.20 1.85 0.5 -176.5 Howland and Baker 2006 08 25 23 2006 08 29 00 29.80 1.35 1.30 2.50 0.5 -176.5 Howland and Baker 2006 08 29 00 2006 09 01 23 30.00 1.55 1.50 3.25 0.5 -176.5 Howland and Baker 2006 09 01 23 2006 09 04 23 30.00 1.54 1.50 4.00 0.5 -176.5 Howland and Baker 2006 09 04 23 2006 09 09 00 30.00 1.52 1.50 4.75 0.5 -176.5 Howland and Baker 2006 09 09 00 2006 09 11 23 29.90 1.41 1.40 5.45 0.5 -176.5 Howland and Baker 2006 09 11 23 2006 09 16 00 29.60 1.10 1.10 6.00 0.5 -176.5 Howland and Baker 2006 09 16 00 2006 09 18 23 29.70 1.21 1.20 6.60 0.5 -176.5 Howland and Baker 2006 09 18 23 2006 09 23 01 29.80 1.33 1.30 7.25 0.5 -176.5 Howland and Baker 2006 09 23 01 2006 09 26 00 29.40 0.94 0.90 7.25 0.5 -176.5 Howland and Baker 2006 09 26 00 2006 09 29 23 29.50 1.05 1.00 7.75 0.5 -176.5 Howland and Baker 2006 09 29 23 2006 10 03 05 29.10 0.66 0.60 7.75 0.5 -176.5 Howland and Baker 2006 10 03 05 2006 10 07 00 28.70 0.27 0.20 7.75 0.5 -176.5 Howland and Baker 2006 10 07 00 2006 10 09 23 28.80 0.38 0.30 7.75 0.5 -176.5 Howland and Baker 2006 10 09 23 2006 10 14 05 28.80 0.40 0.30 7.75 0.5 -176.5 Howland and Baker 2006 10 14 05 2006 10 17 00 29.40 1.01 0.90 7.75 0.5 -176.5 Howland and Baker 2006 10 17 00 2006 10 20 23 29.90 1.53 1.40 8.45 0.5 -176.5 Howland and Baker 2006 10 20 23 2006 10 24 05 29.90 1.56 1.40 9.15 0.5 -176.5 Howland and Baker 2006 10 24 05 2006 10 28 00 30.10 1.78 1.60 9.95 0.5 -176.5 Howland and Baker 2006 10 28 00 2006 10 30 23 30.20 1.90 1.70 10.80 0.5 -176.5 Howland and Baker 2006 10 30 23 2006 11 03 22 29.90 1.62 1.40 11.50 0.5 -176.5 Howland and Baker 2006 11 03 22 2006 11 06 23 30.00 1.74 1.50 12.25 0.5 -176.5 Howland and Baker 2006 11 06 23 2006 11 11 04 30.10 1.87 1.60 12.40 0.5 -176.5 Howland and Baker 2006 11 11 04 2006 11 13 22 30.20 1.99 1.70 12.65 0.5 -176.5 Howland and Baker 2006 11 13 22 2006 11 17 23 30.30 2.09 1.80 12.95 0.5 -176.5 Howland and Baker 2006 11 17 23 2006 11 21 05 30.40 2.18 1.90 13.25 0.5 -176.5 Howland and Baker 2006 11 21 05 2006 11 25 00 30.40 2.17 1.90 13.45 0.5 -176.5 Howland and Baker 2006 11 25 00 2006 11 27 23 30.00 1.76 1.50 13.45 0.5 -176.5 Howland and Baker 2006 11 27 23 2006 12 02 04 30.00 1.74 1.50 13.45 0.5 -176.5 Howland and Baker 2006 12 02 04 2006 12 05 00 30.00 1.73 1.50 13.50 0.5 -176.5 Howland and Baker 2006 12 05 00 2006 12 08 23 30.20 1.92 1.70 13.80 0.5 -176.5 Howland and Baker 2006 12 08 23 2006 12 12 04 30.10 1.81 1.60 14.00 0.5 -176.5 Howland and Baker 2006 12 12 04 2006 12 16 00 29.90 1.61 1.40 14.05 0.5 -176.5 Howland and Baker 2006 12 16 00 2006 12 18 23 30.00 1.72 1.50 14.80 0.5 -176.5 Howland and Baker 2006 12 18 23 2006 12 23 00 29.80 1.55 1.30 14.95 0.5 -176.5 Howland and Baker 2006 12 23 00 2006 12 26 00 29.90 1.67 1.40 15.65 0.5 -176.5 Howland and Baker 2006 12 26 00 2006 12 30 05 29.60 1.40 1.10 16.20 0.5 -176.5 Howland and Baker 2006 12 30 05 2007 01 01 22 29.60 1.41 1.10 16.75 0.5 -176.5 Howland and Baker 2007 01 01 22 2007 01 05 23 29.20 1.04 0.70 16.75 0.5 -176.5 Howland and Baker 2007 01 05 23 2007 01 09 05 28.80 0.66 0.30 16.75 0.5 -176.5 Howland and Baker 2007 01 09 05 2007 01 13 00 28.70 0.59 0.20 16.05 0.5 -176.5 Howland and Baker 2007 01 13 00 2007 01 15 23 28.70 0.60 0.20 15.35 0.5 -176.5 Howland and Baker 2007 01 15 23 2007 01 20 05 28.70 0.67 0.20 14.55 0.5 -176.5 Howland and Baker 2007 01 20 05 2007 01 23 00 28.70 0.71 0.20 13.70 0.5 -176.5 Howland and Baker 2007 01 23 00 2007 01 26 23 28.20 0.25 0.00 13.00 0.5 -176.5 Howland and Baker 2007 01 26 23 2007 01 30 05 28.30 0.40 0.00 12.25 0.5 -176.5 Howland and Baker 2007 01 30 05 2007 02 03 00 28.50 0.65 0.00 11.45 0.5 -176.5 Howland and Baker 2007 02 03 00 2007 02 05 23 28.30 0.48 0.00 10.60 0.5 -176.5 Howland and Baker 2007 02 05 23 2007 02 10 00 28.30 0.55 0.00 9.70 0.5 -176.5 Howland and Baker 2007 02 10 00 2007 02 13 00 28.20 0.49 0.00 8.75 0.5 -176.5 Howland and Baker 2007 02 13 00 2007 02 17 05 27.80 0.12 0.00 7.80 0.5 -176.5 Howland and Baker 2007 02 17 05 2007 02 20 00 27.80 0.14 0.00 7.05 0.5 -176.5 Howland and Baker 2007 02 20 00 2007 02 23 23 28.20 0.56 0.00 6.30 0.5 -176.5 Howland and Baker 2007 02 23 23 2007 02 27 05 28.00 0.39 0.00 5.55 0.5 -176.5 Howland and Baker 2007 02 27 05 2007 03 03 00 27.60 0.02 0.00 4.70 0.5 -176.5 Howland and Baker 2007 02 27 05 2007 03 03 00 27.60 0.02 0.00 4.70 0.5 -176.5 Howland and Baker 2007 03 03 00 2007 03 05 23 27.70 0.13 0.00 3.90 0.5 -176.5 Howland and Baker 2007 03 05 23 2007 03 09 23 27.80 0.26 0.00 3.20 0.5 -176.5 Howland and Baker 2007 03 09 23 2007 03 13 00 27.80 0.29 0.00 2.45 0.5 -176.5 Howland and Baker 2007 03 13 00 2007 03 16 23 27.70 0.19 0.00 1.80 0.5 -176.5 Howland and Baker 2007 03 16 23 2007 03 20 04 27.70 0.17 0.00 1.10 0.5 -176.5 Howland and Baker 2007 03 20 04 2007 03 24 00 27.60 0.04 0.00 0.55 0.5 -176.5 Howland and Baker 2007 03 24 00 2007 03 26 23 27.50 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2007 03 26 23 2007 03 30 22 27.60 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2007 03 30 22 2007 04 03 00 27.90 0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 03 00 2007 04 07 05 28.20 0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 07 05 2007 04 09 22 28.20 0.54 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 09 22 2007 04 13 23 28.10 0.41 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 13 23 2007 04 17 05 28.10 0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 17 05 2007 04 21 00 27.80 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 21 00 2007 04 23 23 27.90 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 23 23 2007 04 28 04 28.00 0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 28 04 2007 05 01 00 28.00 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2007 04 28 04 2007 05 01 00 28.00 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 01 00 2007 05 03 00 28.00 0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 03 00 2007 05 07 05 28.20 0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 07 05 2007 05 10 00 28.40 0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 10 00 2007 05 13 23 28.30 0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 13 23 2007 05 17 04 28.30 0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 17 04 2007 05 21 00 28.30 0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 21 00 2007 05 23 23 28.30 0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 23 23 2007 05 28 00 28.20 0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2007 05 28 00 2007 05 31 00 28.60 0.45 0.10 0.00 0.5 -176.5 Howland and Baker 2007 05 31 00 2007 06 04 05 28.60 0.44 0.10 0.00 0.5 -176.5 Howland and Baker 2007 06 04 05 2007 06 07 00 28.50 0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 07 00 2007 06 11 00 28.60 0.41 0.10 0.00 0.5 -176.5 Howland and Baker 2007 06 11 00 2007 06 14 05 28.40 0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 14 05 2007 06 18 00 28.50 0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 18 00 2007 06 21 00 28.50 0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 21 00 2007 06 25 04 28.00 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 25 04 2007 06 28 00 27.90 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 28 00 2007 07 01 23 28.40 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2007 06 28 00 2007 07 01 23 28.40 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 01 23 2007 07 05 04 28.40 0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 05 04 2007 07 09 00 28.20 -0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 09 00 2007 07 11 23 28.40 0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 11 23 2007 07 16 00 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 16 00 2007 07 19 00 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2007 07 19 00 2007 07 23 04 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 23 04 2007 07 26 00 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 26 00 2007 07 30 00 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2007 07 30 00 2007 08 02 04 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 02 04 2007 08 06 00 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 06 00 2007 08 09 03 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 09 03 2007 08 13 04 27.70 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 13 04 2007 08 16 03 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 16 03 2007 08 20 04 28.20 -0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 20 04 2007 08 23 04 28.20 -0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 23 04 2007 08 27 03 27.80 -0.64 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 27 03 2007 08 30 05 27.70 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2007 08 30 05 2007 09 03 03 28.00 -0.46 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 03 03 2007 09 06 03 27.90 -0.57 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 06 03 2007 09 10 05 27.30 -1.18 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 10 05 2007 09 13 03 27.30 -1.19 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 13 03 2007 09 17 02 27.30 -1.19 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 17 02 2007 09 20 04 27.10 -1.38 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 20 04 2007 09 24 03 27.60 -0.87 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 24 03 2007 09 26 23 27.40 -1.06 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 26 23 2007 10 01 04 27.30 -1.15 0.00 0.00 0.5 -176.5 Howland and Baker 2007 09 26 23 2007 10 01 04 27.30 -1.15 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 01 04 2007 10 04 03 27.00 -1.44 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 04 03 2007 10 08 05 26.80 -1.62 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 08 05 2007 10 11 04 26.80 -1.61 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 11 04 2007 10 15 03 26.80 -1.60 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 15 03 2007 10 18 05 27.00 -1.38 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 18 05 2007 10 22 03 26.90 -1.45 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 22 03 2007 10 25 03 27.00 -1.34 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 25 03 2007 10 29 05 26.70 -1.61 0.00 0.00 0.5 -176.5 Howland and Baker 2007 10 29 05 2007 11 01 03 26.80 -1.49 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 01 03 2007 11 05 03 27.00 -1.26 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 05 03 2007 11 08 05 26.40 -1.85 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 08 05 2007 11 12 03 26.40 -1.82 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 12 03 2007 11 15 03 26.10 -2.10 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 15 03 2007 11 19 03 26.00 -2.21 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 19 03 2007 11 22 03 26.70 -1.52 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 22 03 2007 11 26 05 26.60 -1.64 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 26 05 2007 11 29 03 26.30 -1.95 0.00 0.00 0.5 -176.5 Howland and Baker 2007 11 29 03 2007 12 03 03 26.70 -1.56 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 03 03 2007 12 06 05 26.80 -1.47 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 06 05 2007 12 10 03 26.80 -1.48 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 10 03 2007 12 13 03 26.60 -1.69 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 13 03 2007 12 17 05 25.70 -2.59 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 17 05 2007 12 20 03 26.00 -2.27 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 20 03 2007 12 24 05 26.00 -2.24 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 24 05 2007 12 27 05 26.00 -2.22 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 27 05 2007 12 31 03 25.80 -2.40 0.00 0.00 0.5 -176.5 Howland and Baker 2007 12 31 03 2008 01 03 05 25.80 -2.38 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 03 05 2008 01 07 03 25.70 -2.45 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 07 03 2008 01 10 03 25.70 -2.43 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 10 03 2008 01 14 05 25.40 -2.71 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 14 05 2008 01 17 03 25.30 -2.77 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 17 03 2008 01 21 03 25.20 -2.82 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 21 03 2008 01 24 04 25.20 -2.78 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 24 04 2008 01 28 03 25.60 -2.33 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 28 03 2008 01 31 03 25.50 -2.39 0.00 0.00 0.5 -176.5 Howland and Baker 2008 01 31 03 2008 02 04 04 25.30 -2.53 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 04 04 2008 02 07 00 25.50 -2.29 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 07 00 2008 02 11 05 25.10 -2.64 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 11 05 2008 02 14 04 25.00 -2.70 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 14 04 2008 02 18 03 25.50 -2.17 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 18 03 2008 02 21 05 25.30 -2.35 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 21 05 2008 02 25 03 25.20 -2.42 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 25 03 2008 02 28 03 25.10 -2.50 0.00 0.00 0.5 -176.5 Howland and Baker 2008 02 28 03 2008 03 03 05 25.40 -2.18 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 03 05 2008 03 06 03 25.40 -2.16 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 06 03 2008 03 10 03 25.50 -2.03 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 10 03 2008 03 13 05 25.40 -2.11 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 13 05 2008 03 17 03 25.40 -2.12 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 17 03 2008 03 20 05 25.80 -1.74 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 20 05 2008 03 24 04 25.70 -1.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 24 04 2008 03 27 03 25.80 -1.78 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 27 03 2008 03 31 04 26.00 -1.61 0.00 0.00 0.5 -176.5 Howland and Baker 2008 03 31 04 2008 04 03 03 26.00 -1.63 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 03 03 2008 04 07 03 26.30 -1.35 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 07 03 2008 04 10 05 26.30 -1.37 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 10 05 2008 04 14 03 26.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 14 03 2008 04 17 03 26.50 -1.24 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 17 03 2008 04 21 04 26.20 -1.59 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 21 04 2008 04 24 03 26.70 -1.13 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 24 03 2008 04 28 04 26.80 -1.09 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 28 04 2008 05 01 04 26.70 -1.23 0.00 0.00 0.5 -176.5 Howland and Baker 2008 04 28 04 2008 05 01 04 26.70 -1.23 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 01 04 2008 05 05 03 26.80 -1.18 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 05 03 2008 05 08 04 26.80 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 08 04 2008 05 12 03 26.80 -1.27 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 12 03 2008 05 15 03 26.90 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 15 03 2008 05 19 04 26.90 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 19 04 2008 05 22 03 27.60 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 22 03 2008 05 26 03 27.40 -0.74 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 26 03 2008 05 29 04 27.40 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2008 05 29 04 2008 06 02 03 27.30 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 02 03 2008 06 05 04 27.30 -0.87 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 05 04 2008 06 09 04 27.10 -1.08 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 09 04 2008 06 12 00 27.50 -0.69 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 12 00 2008 06 16 04 27.50 -0.71 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 16 04 2008 06 19 04 27.20 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 19 04 2008 06 23 03 27.40 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 23 03 2008 06 26 04 27.60 -0.68 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 26 04 2008 06 30 03 27.70 -0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2008 06 30 03 2008 07 03 03 27.70 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 03 03 2008 07 07 04 27.60 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 07 04 2008 07 10 03 27.80 -0.57 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 10 03 2008 07 14 04 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 14 04 2008 07 17 04 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 17 04 2008 07 21 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 21 03 2008 07 24 04 27.60 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 24 04 2008 07 28 03 27.60 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 28 03 2008 07 31 03 27.60 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2008 07 31 03 2008 08 04 04 27.50 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 04 04 2008 08 07 03 27.20 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 07 03 2008 08 11 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 11 03 2008 08 14 05 27.60 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 14 05 2008 08 18 03 27.70 -0.71 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 18 03 2008 08 21 04 27.70 -0.72 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 21 04 2008 08 25 04 27.70 -0.74 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 25 04 2008 08 28 03 27.70 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2008 08 28 03 2008 09 01 05 27.60 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 01 05 2008 09 04 03 27.50 -0.97 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 04 03 2008 09 08 03 27.60 -0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 08 03 2008 09 11 05 27.60 -0.89 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 11 05 2008 09 15 03 27.50 -1.00 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 15 03 2008 09 18 02 27.50 -0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 18 02 2008 09 22 04 27.50 -0.97 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 22 04 2008 09 25 03 27.50 -0.96 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 25 03 2008 09 29 05 27.30 -1.15 0.00 0.00 0.5 -176.5 Howland and Baker 2008 09 29 05 2008 10 02 03 27.00 -1.44 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 02 03 2008 10 06 03 27.90 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 06 03 2008 10 09 05 27.80 -0.62 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 09 05 2008 10 13 03 27.90 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 13 03 2008 10 16 03 27.90 -0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 16 03 2008 10 20 05 27.70 -0.66 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 20 05 2008 10 23 03 27.90 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 23 03 2008 10 27 05 27.80 -0.52 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 27 05 2008 10 30 04 27.70 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2008 10 30 04 2008 11 03 03 27.60 -0.67 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 03 03 2008 11 06 05 27.50 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 06 05 2008 11 10 03 27.30 -0.93 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 10 03 2008 11 13 04 27.70 -0.51 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 13 04 2008 11 17 05 27.50 -0.71 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 17 05 2008 11 20 03 27.50 -0.72 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 20 03 2008 11 24 03 27.60 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 24 03 2008 11 27 05 27.50 -0.74 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 27 05 2008 12 01 03 27.40 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 11 27 05 2008 12 01 03 27.40 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 01 03 2008 12 04 03 27.30 -0.97 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 04 03 2008 12 08 03 27.20 -1.08 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 08 03 2008 12 11 04 27.20 -1.09 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 11 04 2008 12 15 05 27.10 -1.19 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 15 05 2008 12 18 03 26.70 -1.57 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 18 03 2008 12 22 03 27.10 -1.15 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 22 03 2008 12 25 05 27.20 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 25 05 2008 12 29 02 27.10 -1.10 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 29 02 2008 12 31 23 27.00 -1.19 0.00 0.00 0.5 -176.5 Howland and Baker 2008 12 31 23 2009 01 05 05 26.90 -1.26 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 05 05 2009 01 08 03 26.80 -1.35 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 08 07 2009 01 12 10 26.60 -1.52 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 12 10 2009 01 15 04 26.60 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 15 04 2009 01 19 03 26.30 -1.75 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 19 03 2009 01 22 04 26.40 -1.61 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 22 04 2009 01 26 03 26.40 -1.55 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 26 03 2009 01 29 03 26.40 -1.51 0.00 0.00 0.5 -176.5 Howland and Baker 2009 01 29 03 2009 02 02 04 26.20 -1.66 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 02 04 2009 02 05 03 26.00 -1.82 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 05 03 2009 02 09 04 26.30 -1.47 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 09 04 2009 02 12 04 26.30 -1.43 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 12 04 2009 02 16 03 26.20 -1.49 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 16 03 2009 02 19 05 26.30 -1.37 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 19 05 2009 02 23 04 26.50 -1.14 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 23 04 2009 02 26 03 26.40 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 26 03 2009 03 02 05 26.60 -0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2009 02 26 03 2009 03 02 05 26.60 -0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 02 05 2009 03 05 03 26.80 -0.77 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 05 03 2009 03 09 03 27.10 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 09 03 2009 03 12 05 27.10 -0.42 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 12 05 2009 03 16 03 27.10 -0.41 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 16 03 2009 03 19 03 27.00 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 19 03 2009 03 23 00 27.00 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 23 00 2009 03 26 03 27.20 -0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 26 03 2009 03 30 04 27.40 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2009 03 30 04 2009 04 02 02 27.50 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 02 02 2009 04 06 03 27.80 0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 06 03 2009 04 09 04 27.70 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 09 04 2009 04 13 03 27.70 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 13 03 2009 04 16 03 27.70 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 16 03 2009 04 20 04 27.70 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 20 04 2009 04 23 03 27.60 -0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 23 03 2009 04 27 04 27.50 -0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 27 04 2009 04 30 04 27.60 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2009 04 30 04 2009 05 04 03 28.40 0.45 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 04 03 2009 05 07 04 28.50 0.51 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 07 04 2009 05 11 04 28.90 0.85 0.40 0.00 0.5 -176.5 Howland and Baker 2009 05 11 04 2009 05 14 03 28.40 0.31 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 14 03 2009 05 18 04 28.40 0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 18 04 2009 05 21 04 28.50 0.38 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 21 04 2009 05 25 03 28.50 0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 25 03 2009 05 28 04 28.50 0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2009 05 28 04 2009 06 01 03 28.30 0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2009 06 01 03 2009 06 04 04 28.50 0.34 0.00 0.00 0.5 -176.5 Howland and Baker 2009 06 04 04 2009 06 08 03 28.80 0.62 0.30 0.00 0.5 -176.5 Howland and Baker 2009 06 08 03 2009 06 11 03 28.80 0.61 0.30 0.00 0.5 -176.5 Howland and Baker 2009 06 11 03 2009 06 15 00 29.20 1.00 0.70 0.00 0.5 -176.5 Howland and Baker 2009 06 15 00 2009 06 18 01 29.00 0.78 0.50 0.00 0.5 -176.5 Howland and Baker 2009 06 18 01 2009 06 22 04 29.10 0.85 0.60 0.00 0.5 -176.5 Howland and Baker 2009 06 22 04 2009 06 25 04 28.90 0.63 0.40 0.00 0.5 -176.5 Howland and Baker 2009 06 25 04 2009 06 29 05 29.00 0.71 0.50 0.00 0.5 -176.5 Howland and Baker 2009 06 29 05 2009 07 02 04 29.00 0.69 0.50 0.00 0.5 -176.5 Howland and Baker 2009 07 02 04 2009 07 06 03 28.50 0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2009 07 06 03 2009 07 09 03 29.40 1.04 0.90 0.00 0.5 -176.5 Howland and Baker 2009 07 09 03 2009 07 13 04 29.20 0.81 0.70 0.00 0.5 -176.5 Howland and Baker 2009 07 13 04 2009 07 16 03 29.00 0.60 0.50 0.00 0.5 -176.5 Howland and Baker 2009 07 16 03 2009 07 20 03 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2009 07 20 03 2009 07 23 04 29.10 0.70 0.60 0.00 0.5 -176.5 Howland and Baker 2009 07 23 04 2009 07 27 03 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2009 07 27 03 2009 07 30 03 29.10 0.70 0.60 0.00 0.5 -176.5 Howland and Baker 2009 07 30 03 2009 08 03 00 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2009 08 03 00 2009 08 06 00 29.00 0.60 0.50 0.00 0.5 -176.5 Howland and Baker 2009 08 06 00 2009 08 10 04 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2009 08 10 04 2009 08 13 00 29.30 0.90 0.80 0.00 0.5 -176.5 Howland and Baker 2009 08 13 00 2009 08 17 01 29.20 0.79 0.70 0.00 0.5 -176.5 Howland and Baker 2009 08 17 01 2009 08 20 05 29.30 0.88 0.80 0.00 0.5 -176.5 Howland and Baker 2009 08 20 05 2009 08 24 00 29.40 0.97 0.90 0.00 0.5 -176.5 Howland and Baker 2009 08 24 00 2009 08 27 03 29.70 1.26 1.20 0.60 0.5 -176.5 Howland and Baker 2009 08 27 03 2009 08 31 04 29.70 1.25 1.20 1.20 0.5 -176.5 Howland and Baker 2009 08 31 04 2009 09 03 03 29.30 0.84 0.80 1.20 0.5 -176.5 Howland and Baker 2009 09 03 03 2009 09 07 02 29.10 0.63 0.60 1.20 0.5 -176.5 Howland and Baker 2009 09 07 02 2009 09 10 04 29.00 0.52 0.50 1.20 0.5 -176.5 Howland and Baker 2009 09 10 04 2009 09 14 03 29.00 0.50 0.50 1.20 0.5 -176.5 Howland and Baker 2009 09 14 03 2009 09 17 02 29.00 0.51 0.50 1.20 0.5 -176.5 Howland and Baker 2009 09 17 02 2009 09 21 03 29.00 0.52 0.50 1.20 0.5 -176.5 Howland and Baker 2009 09 21 03 2009 09 24 03 28.90 0.43 0.40 1.20 0.5 -176.5 Howland and Baker 2009 09 24 03 2009 09 28 04 29.10 0.64 0.60 1.20 0.5 -176.5 Howland and Baker 2009 09 28 04 2009 10 01 03 29.00 0.55 0.50 1.20 0.5 -176.5 Howland and Baker 2009 09 28 04 2009 10 01 03 29.00 0.55 0.50 1.20 0.5 -176.5 Howland and Baker 2009 10 01 03 2009 10 05 03 28.80 0.37 0.30 1.20 0.5 -176.5 Howland and Baker 2009 10 05 03 2009 10 08 05 28.80 0.38 0.30 1.20 0.5 -176.5 Howland and Baker 2009 10 08 05 2009 10 12 03 29.70 1.29 1.20 1.80 0.5 -176.5 Howland and Baker 2009 10 12 03 2009 10 15 03 29.30 0.90 0.80 1.80 0.5 -176.5 Howland and Baker 2009 10 15 03 2009 10 19 05 29.60 1.23 1.10 2.35 0.5 -176.5 Howland and Baker 2009 10 19 05 2009 10 22 03 29.70 1.35 1.20 2.95 0.5 -176.5 Howland and Baker 2009 10 22 03 2009 10 26 02 30.20 1.87 1.70 3.80 0.5 -176.5 Howland and Baker 2009 10 26 02 2009 10 29 04 30.20 1.89 1.70 4.65 0.5 -176.5 Howland and Baker 2009 10 29 04 2009 11 02 03 30.70 2.42 2.20 5.75 0.5 -176.5 Howland and Baker 2009 11 02 03 2009 11 05 05 30.70 2.44 2.20 6.85 0.5 -176.5 Howland and Baker 2009 11 05 05 2009 11 09 03 30.80 2.56 2.30 8.00 0.5 -176.5 Howland and Baker 2009 11 09 03 2009 11 12 03 30.60 2.38 2.10 9.05 0.5 -176.5 Howland and Baker 2009 11 12 03 2009 11 16 05 30.60 2.40 2.10 10.10 0.5 -176.5 Howland and Baker 2009 11 16 05 2009 11 19 03 30.40 2.19 1.90 10.45 0.5 -176.5 Howland and Baker 2009 11 19 03 2009 11 23 03 30.20 1.97 1.70 10.70 0.5 -176.5 Howland and Baker 2009 11 23 03 2009 11 26 05 30.20 1.96 1.70 11.55 0.5 -176.5 Howland and Baker 2009 11 26 05 2009 11 30 03 30.50 2.25 2.00 12.55 0.5 -176.5 Howland and Baker 2009 11 30 03 2009 12 03 03 30.50 2.24 2.00 13.55 0.5 -176.5 Howland and Baker 2009 12 03 03 2009 12 07 05 30.50 2.23 2.00 14.55 0.5 -176.5 Howland and Baker 2009 12 07 05 2009 12 10 03 30.10 1.82 1.60 15.35 0.5 -176.5 Howland and Baker 2009 12 10 03 2009 12 14 03 30.00 1.70 1.50 16.10 0.5 -176.5 Howland and Baker 2009 12 14 03 2009 12 17 04 30.00 1.71 1.50 16.85 0.5 -176.5 Howland and Baker 2009 12 17 04 2009 12 21 04 30.10 1.84 1.60 17.65 0.5 -176.5 Howland and Baker 2009 12 21 04 2009 12 24 03 30.10 1.86 1.60 18.45 0.5 -176.5 Howland and Baker 2009 12 24 03 2009 12 28 03 30.10 1.88 1.60 19.25 0.5 -176.5 Howland and Baker 2009 12 28 03 2009 12 31 03 29.80 1.60 1.30 19.90 0.5 -176.5 Howland and Baker 2009 12 31 03 2010 01 04 05 29.80 1.63 1.30 19.95 0.5 -176.5 Howland and Baker 2010 01 04 05 2010 01 07 03 29.80 1.65 1.30 20.60 0.5 -176.5 Howland and Baker 2010 01 07 03 2010 01 11 03 29.70 1.57 1.20 20.65 0.5 -176.5 Howland and Baker 2010 01 11 03 2010 01 14 05 29.70 1.59 1.20 20.65 0.5 -176.5 Howland and Baker 2010 01 14 05 2010 01 18 03 29.70 1.64 1.20 20.40 0.5 -176.5 Howland and Baker 2010 01 18 03 2010 01 21 03 29.80 1.78 1.30 20.20 0.5 -176.5 Howland and Baker 2010 01 21 03 2010 01 25 05 29.80 1.83 1.30 19.75 0.5 -176.5 Howland and Baker 2010 01 25 05 2010 01 28 03 29.80 1.87 1.30 19.30 0.5 -176.5 Howland and Baker 2010 01 28 03 2010 02 01 05 29.80 1.93 1.30 18.80 0.5 -176.5 Howland and Baker 2010 02 01 05 2010 02 04 04 29.80 1.97 1.30 18.40 0.5 -176.5 Howland and Baker 2010 02 04 04 2010 02 08 03 29.50 1.72 1.00 17.85 0.5 -176.5 Howland and Baker 2010 02 08 03 2010 02 11 02 29.50 1.76 1.00 17.40 0.5 -176.5 Howland and Baker 2010 02 11 02 2010 02 15 03 29.50 1.81 1.00 17.05 0.5 -176.5 Howland and Baker 2010 02 15 03 2010 02 18 03 29.80 2.13 1.30 16.85 0.5 -176.5 Howland and Baker 2010 02 18 03 2010 02 22 05 29.80 2.16 1.30 16.50 0.5 -176.5 Howland and Baker 2010 02 22 05 2010 02 25 03 29.80 2.18 1.30 16.15 0.5 -176.5 Howland and Baker 2010 02 25 03 2010 03 01 03 29.80 2.20 1.30 15.80 0.5 -176.5 Howland and Baker 2010 02 25 03 2010 03 01 03 29.80 2.20 1.30 15.80 0.5 -176.5 Howland and Baker 2010 03 01 03 2010 03 04 05 29.80 2.22 1.30 15.65 0.5 -176.5 Howland and Baker 2010 03 04 05 2010 03 08 03 29.80 2.25 1.30 15.55 0.5 -176.5 Howland and Baker 2010 03 08 03 2010 03 11 03 29.80 2.27 1.30 15.45 0.5 -176.5 Howland and Baker 2010 03 11 03 2010 03 15 05 29.80 2.30 1.30 15.30 0.5 -176.5 Howland and Baker 2010 03 15 05 2010 03 18 03 29.60 2.08 1.10 15.05 0.5 -176.5 Howland and Baker 2010 03 18 03 2010 03 22 05 29.60 2.05 1.10 14.80 0.5 -176.5 Howland and Baker 2010 03 22 05 2010 03 25 04 29.60 2.04 1.10 14.70 0.5 -176.5 Howland and Baker 2010 03 25 04 2010 03 29 03 29.00 1.41 0.50 14.05 0.5 -176.5 Howland and Baker 2010 03 29 03 2010 04 01 05 29.00 1.39 0.50 13.40 0.5 -176.5 Howland and Baker 2010 04 01 05 2010 04 05 04 29.10 1.46 0.60 12.80 0.5 -176.5 Howland and Baker 2010 04 05 04 2010 04 08 03 29.10 1.45 0.60 12.20 0.5 -176.5 Howland and Baker 2010 04 08 03 2010 04 12 04 29.20 1.52 0.70 11.60 0.5 -176.5 Howland and Baker 2010 04 12 04 2010 04 15 04 29.20 1.50 0.70 10.95 0.5 -176.5 Howland and Baker 2010 04 15 04 2010 04 19 03 29.00 1.25 0.50 10.30 0.5 -176.5 Howland and Baker 2010 04 19 03 2010 04 22 04 29.00 1.21 0.50 9.65 0.5 -176.5 Howland and Baker 2010 04 22 04 2010 04 26 03 29.20 1.35 0.70 9.00 0.5 -176.5 Howland and Baker 2010 04 26 03 2010 04 29 03 29.20 1.31 0.70 8.35 0.5 -176.5 Howland and Baker 2010 04 29 03 2010 05 03 04 29.00 1.06 0.50 7.85 0.5 -176.5 Howland and Baker 2010 05 03 04 2010 05 06 03 28.70 0.72 0.20 7.35 0.5 -176.5 Howland and Baker 2010 05 06 03 2010 05 10 04 28.70 0.67 0.20 6.85 0.5 -176.5 Howland and Baker 2010 05 10 04 2010 05 13 04 28.70 0.63 0.20 6.20 0.5 -176.5 Howland and Baker 2010 05 13 04 2010 05 17 03 28.70 0.59 0.20 5.55 0.5 -176.5 Howland and Baker 2010 05 17 03 2010 05 20 04 28.70 0.58 0.20 4.90 0.5 -176.5 Howland and Baker 2010 05 20 04 2010 05 24 04 28.40 0.27 0.00 4.25 0.5 -176.5 Howland and Baker 2010 05 24 04 2010 05 27 03 28.30 0.16 0.00 3.60 0.5 -176.5 Howland and Baker 2010 05 27 03 2010 05 31 04 28.30 0.15 0.00 2.95 0.5 -176.5 Howland and Baker 2010 05 31 04 2010 06 03 04 28.60 0.44 0.10 2.30 0.5 -176.5 Howland and Baker 2010 06 03 04 2010 06 07 03 28.50 0.33 0.00 1.65 0.5 -176.5 Howland and Baker 2010 06 07 03 2010 06 10 04 28.40 0.22 0.00 1.10 0.5 -176.5 Howland and Baker 2010 06 10 04 2010 06 14 03 28.30 0.10 0.00 0.55 0.5 -176.5 Howland and Baker 2010 06 14 03 2010 06 17 03 28.10 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2010 06 17 03 2010 06 21 04 28.20 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2010 06 21 04 2010 06 24 03 28.20 -0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2010 06 24 03 2010 06 28 04 28.30 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2010 06 28 04 2010 07 01 04 28.30 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2010 06 28 04 2010 07 01 04 28.30 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 01 04 2010 07 05 03 27.70 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 05 03 2010 07 08 04 27.60 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 08 04 2010 07 12 04 27.50 -0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 12 04 2010 07 15 03 27.70 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 15 03 2010 07 19 04 27.70 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 19 04 2010 07 22 03 27.50 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 22 03 2010 07 26 03 27.60 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 26 03 2010 07 29 04 27.50 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2010 07 29 04 2010 08 02 03 27.20 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 02 03 2010 08 05 04 27.20 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 05 04 2010 08 09 04 26.80 -1.60 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 09 04 2010 08 12 03 26.90 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 12 03 2010 08 16 05 26.70 -1.70 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 16 05 2010 08 19 04 26.40 -2.01 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 19 04 2010 08 23 03 26.40 -2.03 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 23 03 2010 08 26 05 26.00 -2.44 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 26 05 2010 08 30 03 26.30 -2.15 0.00 0.00 0.5 -176.5 Howland and Baker 2010 08 30 03 2010 09 02 03 26.20 -2.26 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 02 03 2010 09 06 05 25.70 -2.77 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 06 05 2010 09 09 03 26.20 -2.28 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 09 03 2010 09 13 05 26.70 -1.79 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 13 05 2010 09 16 05 26.70 -1.80 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 16 05 2010 09 20 03 26.70 -1.78 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 20 03 2010 09 23 05 26.60 -1.87 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 23 05 2010 09 27 03 26.90 -1.56 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 27 03 2010 09 30 03 26.80 -1.65 0.00 0.00 0.5 -176.5 Howland and Baker 2010 09 30 03 2010 10 04 05 26.60 -1.84 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 04 05 2010 10 07 03 26.60 -1.83 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 07 03 2010 10 11 03 25.90 -2.51 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 11 03 2010 10 14 05 26.00 -2.40 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 14 05 2010 10 18 03 26.10 -2.28 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 18 03 2010 10 21 03 26.20 -2.16 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 21 03 2010 10 25 05 26.30 -2.04 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 25 05 2010 10 28 03 26.70 -1.62 0.00 0.00 0.5 -176.5 Howland and Baker 2010 10 28 03 2010 11 01 05 27.20 -1.09 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 01 05 2010 11 04 04 27.20 -1.07 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 04 04 2010 11 08 04 25.70 -2.55 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 08 04 2010 11 11 05 25.90 -2.33 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 11 05 2010 11 15 03 26.20 -2.00 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 15 03 2010 11 18 04 26.60 -1.61 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 18 04 2010 11 22 05 26.40 -1.82 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 22 05 2010 11 25 03 26.30 -1.93 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 25 03 2010 11 29 03 26.20 -2.05 0.00 0.00 0.5 -176.5 Howland and Baker 2010 11 29 03 2010 12 02 05 26.30 -1.96 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 02 05 2010 12 06 03 26.40 -1.87 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 06 03 2010 12 09 05 26.50 -1.78 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 09 05 2010 12 13 04 26.30 -1.99 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 13 04 2010 12 16 03 26.20 -2.09 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 16 03 2010 12 20 05 26.20 -2.07 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 20 05 2010 12 23 03 26.10 -2.15 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 23 03 2010 12 27 03 25.80 -2.42 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 27 03 2010 12 30 05 25.80 -2.40 0.00 0.00 0.5 -176.5 Howland and Baker 2010 12 30 05 2011 01 03 03 25.80 -2.38 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 03 03 2011 01 06 03 26.10 -2.06 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 06 03 2011 01 10 04 25.60 -2.53 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 10 04 2011 01 13 03 25.80 -2.31 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 13 03 2011 01 17 05 25.50 -2.57 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 17 05 2011 01 20 05 25.60 -2.43 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 20 05 2011 01 24 03 25.90 -2.08 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 24 03 2011 01 27 05 25.80 -2.14 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 27 05 2011 01 31 03 26.10 -1.79 0.00 0.00 0.5 -176.5 Howland and Baker 2011 01 31 03 2011 02 03 03 26.10 -1.75 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 03 03 2011 02 07 05 26.10 -1.69 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 07 05 2011 02 10 03 26.10 -1.65 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 10 03 2011 02 14 03 26.10 -1.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 14 03 2011 02 17 05 26.00 -1.68 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 17 05 2011 02 21 03 26.40 -1.25 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 21 03 2011 02 24 03 26.20 -1.43 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 24 03 2011 02 28 04 26.10 -1.50 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 28 04 2011 03 03 03 26.30 -1.28 0.00 0.00 0.5 -176.5 Howland and Baker 2011 02 28 04 2011 03 03 03 26.30 -1.28 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 03 03 2011 03 07 05 26.50 -1.06 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 07 05 2011 03 10 04 26.50 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 10 04 2011 03 14 03 26.70 -0.81 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 14 03 2011 03 17 05 26.70 -0.81 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 17 05 2011 03 19 22 26.80 -0.73 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 19 22 2011 03 24 03 26.80 -0.76 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 24 03 2011 03 28 04 26.70 -0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 28 04 2011 03 31 03 26.90 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2011 03 31 03 2011 04 04 05 27.00 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 04 05 2011 04 07 04 27.00 -0.65 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 07 04 2011 04 11 03 27.20 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 11 03 2011 04 14 04 27.30 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 14 04 2011 04 18 04 27.10 -0.64 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 18 04 2011 04 21 03 27.20 -0.58 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 21 03 2011 04 25 04 27.30 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 25 04 2011 04 28 04 27.40 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2011 04 28 04 2011 05 02 03 27.40 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 02 03 2011 05 05 05 27.40 -0.57 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 05 05 2011 05 09 03 27.70 -0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 09 03 2011 05 12 03 27.80 -0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 12 03 2011 05 16 04 28.10 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 16 04 2011 05 19 03 28.10 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 19 03 2011 05 23 04 28.10 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 23 04 2011 05 26 04 28.10 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 26 04 2011 05 30 03 27.60 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2011 05 30 03 2011 06 02 04 27.90 -0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 02 04 2011 06 06 04 28.10 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 06 04 2011 06 09 03 28.10 -0.08 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 09 03 2011 06 13 04 28.00 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 13 04 2011 06 16 03 28.00 -0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 16 03 2011 06 20 03 28.10 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 20 03 2011 06 23 04 28.00 -0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 23 04 2011 06 27 03 28.30 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 27 03 2011 06 30 03 28.40 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2011 06 30 03 2011 07 04 04 28.30 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 04 04 2011 07 07 03 28.20 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 07 03 2011 07 11 04 28.10 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 11 04 2011 07 14 04 28.30 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 14 04 2011 07 18 03 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 18 03 2011 07 21 04 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 21 04 2011 07 25 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 25 03 2011 07 28 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 07 28 03 2011 08 01 04 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 01 04 2011 08 04 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 04 03 2011 08 08 04 28.00 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 08 04 2011 08 11 03 28.00 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 11 03 2011 08 15 03 27.80 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 15 03 2011 08 18 05 27.80 -0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 18 05 2011 08 22 04 27.60 -0.82 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 22 04 2011 08 25 03 27.90 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 25 03 2011 08 29 04 28.00 -0.45 0.00 0.00 0.5 -176.5 Howland and Baker 2011 08 29 04 2011 09 01 03 27.80 -0.65 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 01 03 2011 09 05 03 28.10 -0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 05 03 2011 09 08 05 28.00 -0.48 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 08 05 2011 09 12 03 27.80 -0.69 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 12 03 2011 09 15 05 27.70 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 15 05 2011 09 19 03 27.70 -0.79 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 19 03 2011 09 22 03 27.70 -0.78 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 22 03 2011 09 26 05 27.50 -0.96 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 26 05 2011 09 29 03 27.30 -1.15 0.00 0.00 0.5 -176.5 Howland and Baker 2011 09 29 03 2011 10 03 03 27.20 -1.24 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 03 03 2011 10 06 05 26.60 -1.83 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 06 05 2011 10 10 03 27.50 -0.92 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 10 03 2011 10 13 03 27.80 -0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 13 03 2011 10 17 04 28.00 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 17 04 2011 10 20 03 28.30 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 20 03 2011 10 24 05 28.00 -0.34 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 24 05 2011 10 27 04 27.90 -0.42 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 27 04 2011 10 31 03 27.90 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2011 10 31 03 2011 11 03 05 27.80 -0.48 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 03 05 2011 11 07 03 27.50 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 07 03 2011 11 10 03 27.20 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 10 03 2011 11 14 05 27.30 -0.91 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 14 05 2011 11 17 03 26.90 -1.31 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 17 03 2011 11 21 05 27.00 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 21 05 2011 11 24 05 27.20 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 24 05 2011 11 28 04 27.40 -0.84 0.00 0.00 0.5 -176.5 Howland and Baker 2011 11 28 04 2011 12 01 05 27.40 -0.85 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 01 05 2011 12 05 03 27.30 -0.97 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 05 03 2011 12 08 04 27.00 -1.28 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 08 04 2011 12 12 05 26.90 -1.39 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 12 05 2011 12 15 03 26.90 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 15 03 2011 12 19 03 26.90 -1.37 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 19 03 2011 12 22 05 26.80 -1.45 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 22 05 2011 12 26 03 26.10 -2.13 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 26 03 2011 12 29 05 26.30 -1.91 0.00 0.00 0.5 -176.5 Howland and Baker 2011 12 29 05 2012 01 02 04 26.40 -1.78 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 02 04 2012 01 05 03 26.50 -1.66 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 05 03 2012 01 09 05 26.40 -1.74 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 09 05 2012 01 12 03 26.30 -1.82 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 12 03 2012 01 16 03 26.70 -1.39 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 16 03 2012 01 19 05 26.80 -1.25 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 19 05 2012 01 23 03 26.50 -1.49 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 23 03 2012 01 26 03 26.50 -1.45 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 26 03 2012 01 30 04 26.60 -1.30 0.00 0.00 0.5 -176.5 Howland and Baker 2012 01 30 04 2012 02 02 03 26.50 -1.36 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 02 03 2012 02 06 05 26.40 -1.41 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 06 05 2012 02 09 04 26.40 -1.37 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 09 04 2012 02 13 03 26.70 -1.01 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 13 03 2012 02 16 05 26.60 -1.09 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 16 05 2012 02 20 03 26.60 -1.06 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 20 03 2012 02 23 03 26.30 -1.34 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 23 03 2012 02 27 05 26.80 -0.81 0.00 0.00 0.5 -176.5 Howland and Baker 2012 02 27 05 2012 03 01 03 27.10 -0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 01 03 2012 03 05 05 27.10 -0.46 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 05 05 2012 03 08 05 26.80 -0.74 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 08 05 2012 03 12 03 27.40 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 12 03 2012 03 15 05 27.30 -0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 15 05 2012 03 19 03 27.20 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 19 03 2012 03 22 03 27.00 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 22 03 2012 03 26 05 27.30 -0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 26 05 2012 03 29 03 27.20 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2012 03 29 03 2012 04 02 03 27.00 -0.62 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 02 03 2012 04 05 05 27.10 -0.54 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 05 05 2012 04 09 03 27.50 -0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 09 03 2012 04 12 05 27.50 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 12 05 2012 04 16 04 27.70 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 16 04 2012 04 19 03 27.60 -0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 19 03 2012 04 23 04 27.70 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 23 04 2012 04 26 04 27.90 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 26 04 2012 04 29 20 28.00 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2012 04 29 20 2012 05 03 04 27.90 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 03 04 2012 05 07 03 27.90 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 07 03 2012 05 10 04 28.00 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 10 04 2012 05 14 04 27.80 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 14 04 2012 05 17 03 28.00 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 17 03 2012 05 21 04 28.10 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 21 04 2012 05 24 04 28.00 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 24 04 2012 05 28 03 28.00 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 28 03 2012 05 31 04 28.10 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2012 05 31 04 2012 06 04 03 28.10 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 04 03 2012 06 07 03 28.10 -0.08 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 07 03 2012 06 11 04 28.00 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 11 04 2012 06 14 03 28.20 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 14 03 2012 06 18 04 28.20 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 18 04 2012 06 21 04 28.20 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 21 04 2012 06 25 03 28.50 0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 25 03 2012 06 28 04 28.50 0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2012 06 28 04 2012 07 02 03 28.50 0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 02 03 2012 07 05 03 28.30 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 05 03 2012 07 09 04 28.30 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 09 04 2012 07 12 03 27.90 -0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 12 03 2012 07 16 04 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 16 04 2012 07 19 04 28.50 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 19 04 2012 07 23 03 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2012 07 23 03 2012 07 26 04 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 26 04 2012 07 30 04 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2012 07 30 04 2012 08 02 00 28.60 0.20 0.10 0.00 0.5 -176.5 Howland and Baker 2012 08 02 00 2012 08 06 04 28.70 0.30 0.20 0.00 0.5 -176.5 Howland and Baker 2012 08 06 04 2012 08 09 03 28.80 0.40 0.30 0.00 0.5 -176.5 Howland and Baker 2012 08 09 03 2012 08 13 04 28.90 0.50 0.40 0.00 0.5 -176.5 Howland and Baker 2012 08 13 04 2012 08 16 05 28.50 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2012 08 16 05 2012 08 20 03 29.10 0.68 0.60 0.00 0.5 -176.5 Howland and Baker 2012 08 20 03 2012 08 23 04 29.40 0.97 0.90 0.00 0.5 -176.5 Howland and Baker 2012 08 23 04 2012 08 27 04 29.40 0.96 0.90 0.00 0.5 -176.5 Howland and Baker 2012 08 27 04 2012 08 30 03 29.00 0.55 0.50 0.00 0.5 -176.5 Howland and Baker 2012 08 30 03 2012 09 03 05 29.00 0.54 0.50 0.00 0.5 -176.5 Howland and Baker 2012 09 03 05 2012 09 06 03 29.00 0.53 0.50 0.00 0.5 -176.5 Howland and Baker 2012 09 06 03 2012 09 10 04 28.60 0.11 0.10 0.00 0.5 -176.5 Howland and Baker 2012 09 10 04 2012 09 13 05 28.50 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2012 09 13 05 2012 09 17 03 28.80 0.31 0.30 0.00 0.5 -176.5 Howland and Baker 2012 09 17 03 2012 09 20 05 28.50 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2012 09 20 05 2012 09 24 03 28.50 0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2012 09 24 03 2012 09 27 03 28.60 0.14 0.10 0.00 0.5 -176.5 Howland and Baker 2012 09 27 03 2012 10 01 05 28.70 0.26 0.20 0.00 0.5 -176.5 Howland and Baker 2012 10 01 05 2012 10 04 03 28.30 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2012 10 04 03 2012 10 08 05 28.60 0.18 0.10 0.00 0.5 -176.5 Howland and Baker 2012 10 08 05 2012 10 11 05 28.60 0.19 0.10 0.00 0.5 -176.5 Howland and Baker 2012 10 11 05 2012 10 15 03 28.80 0.41 0.30 0.00 0.5 -176.5 Howland and Baker 2012 10 15 03 2012 10 18 05 28.80 0.43 0.30 0.00 0.5 -176.5 Howland and Baker 2012 10 18 05 2012 10 22 03 28.80 0.45 0.30 0.00 0.5 -176.5 Howland and Baker 2012 10 22 03 2012 10 25 03 29.10 0.77 0.60 0.00 0.5 -176.5 Howland and Baker 2012 10 25 03 2012 10 29 02 29.00 0.70 0.50 0.00 0.5 -176.5 Howland and Baker 2012 10 29 02 2012 11 01 03 29.10 0.82 0.60 0.00 0.5 -176.5 Howland and Baker 2012 11 01 03 2012 11 05 05 29.10 0.84 0.60 0.00 0.5 -176.5 Howland and Baker 2012 11 05 05 2012 11 08 03 29.00 0.76 0.50 0.00 0.5 -176.5 Howland and Baker 2012 11 08 03 2012 11 12 03 28.80 0.59 0.30 0.00 0.5 -176.5 Howland and Baker 2012 11 12 03 2012 11 15 05 29.00 0.80 0.50 0.00 0.5 -176.5 Howland and Baker 2012 11 15 05 2012 11 19 04 28.90 0.68 0.40 0.00 0.5 -176.5 Howland and Baker 2012 11 19 04 2012 11 22 03 28.70 0.47 0.20 0.00 0.5 -176.5 Howland and Baker 2012 11 22 03 2012 11 26 05 28.40 0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2012 11 26 05 2012 11 29 03 28.50 0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2012 11 29 03 2012 12 03 04 28.30 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 03 04 2012 12 06 05 28.40 0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 06 05 2012 12 10 03 28.00 -0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 10 03 2012 12 13 05 28.40 0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 13 05 2012 12 17 04 29.10 0.82 0.60 0.00 0.5 -176.5 Howland and Baker 2012 12 17 04 2012 12 20 04 28.50 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 20 04 2012 12 24 05 28.20 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 24 05 2012 12 27 03 28.20 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 27 03 2012 12 31 03 27.50 -0.69 0.00 0.00 0.5 -176.5 Howland and Baker 2012 12 31 03 2013 01 03 05 27.80 -0.38 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 03 05 2013 01 07 03 27.40 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 07 03 2013 01 10 05 27.70 -0.43 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 10 05 2013 01 14 04 27.70 -0.41 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 14 04 2013 01 17 03 27.70 -0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 17 03 2013 01 21 05 27.70 -0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 21 05 2013 01 24 03 27.70 -0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 24 03 2013 01 28 03 28.20 0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 28 03 2013 01 31 05 27.70 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2013 01 31 05 2013 02 04 03 28.10 0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 04 03 2013 02 07 05 28.10 0.31 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 07 05 2013 02 11 04 28.20 0.46 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 11 04 2013 02 14 03 27.60 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 14 03 2013 02 18 05 27.50 -0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 18 05 2013 02 21 04 27.30 -0.35 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 21 04 2013 02 25 03 27.20 -0.42 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 25 03 2013 02 28 05 27.00 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2013 02 28 05 2013 03 04 03 27.40 -0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 04 03 2013 03 07 05 27.20 -0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 07 05 2013 03 11 04 27.20 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 11 04 2013 03 14 03 27.40 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 14 03 2013 03 18 05 27.40 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 18 05 2013 03 21 03 27.50 -0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 21 03 2013 03 25 03 27.80 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 25 03 2013 03 28 05 27.80 0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2013 03 28 05 2013 04 01 03 27.60 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 01 03 2013 04 04 05 27.70 0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 04 05 2013 04 08 04 27.60 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 08 04 2013 04 11 03 27.60 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 11 03 2013 04 15 04 27.50 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 15 04 2013 04 18 04 27.50 -0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 18 04 2013 04 22 03 27.70 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 22 03 2013 04 25 04 27.60 -0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 25 04 2013 04 29 03 27.80 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2013 04 29 03 2013 05 02 03 28.00 0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 02 03 2013 05 06 04 28.30 0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 06 04 2013 05 09 03 28.30 0.28 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 09 03 2013 05 13 04 28.20 0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 13 04 2013 05 16 04 27.80 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 16 04 2013 05 20 03 27.90 -0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 20 03 2013 05 23 04 28.10 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 23 04 2013 05 27 03 28.50 0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 27 03 2013 05 30 03 28.40 0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2013 05 30 03 2013 06 03 04 28.40 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 03 04 2013 06 06 03 28.30 0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 06 03 2013 06 10 04 28.50 0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 10 04 2013 06 13 04 28.40 0.21 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 13 04 2013 06 17 03 28.30 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 17 03 2013 06 20 04 27.90 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 20 04 2013 06 24 03 28.30 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 24 03 2013 06 27 03 28.30 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2013 06 27 03 2013 07 01 04 28.20 -0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 01 04 2013 07 04 03 28.70 0.37 0.20 0.00 0.5 -176.5 Howland and Baker 2013 07 04 03 2013 07 08 04 28.70 0.35 0.20 0.00 0.5 -176.5 Howland and Baker 2013 07 08 04 2013 07 11 04 28.30 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 11 04 2013 07 15 03 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 15 03 2013 07 18 04 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 18 04 2013 07 22 03 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 22 03 2013 07 25 03 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 25 03 2013 07 29 04 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 07 29 04 2013 08 01 03 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 01 03 2013 08 05 04 28.10 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 05 04 2013 08 08 04 28.00 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 08 04 2013 08 12 03 28.30 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 12 03 2013 08 15 04 28.20 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 15 04 2013 08 19 03 28.50 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 19 03 2013 08 22 03 28.30 -0.12 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 22 03 2013 08 26 04 28.30 -0.14 0.00 0.00 0.5 -176.5 Howland and Baker 2013 08 26 04 2013 08 29 03 28.60 0.15 0.10 0.00 0.5 -176.5 Howland and Baker 2013 08 29 03 2013 09 02 05 28.50 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 02 05 2013 09 05 04 29.00 0.53 0.50 0.00 0.5 -176.5 Howland and Baker 2013 09 05 04 2013 09 09 03 28.70 0.22 0.20 0.00 0.5 -176.5 Howland and Baker 2013 09 09 03 2013 09 12 05 28.50 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 12 05 2013 09 16 03 28.10 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 16 03 2013 09 19 05 28.30 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 19 05 2013 09 23 03 28.00 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 23 03 2013 09 26 03 27.70 -0.76 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 26 03 2013 09 30 05 28.50 0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2013 09 30 05 2013 10 03 03 27.90 -0.54 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 03 03 2013 10 07 03 27.90 -0.53 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 07 03 2013 10 10 05 27.80 -0.62 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 10 05 2013 10 14 03 28.00 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 14 03 2013 10 17 05 28.20 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 17 05 2013 10 21 03 28.40 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 21 03 2013 10 24 03 28.50 0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 24 03 2013 10 28 05 28.50 0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 28 05 2013 10 31 03 28.30 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2013 10 31 03 2013 11 04 03 28.40 0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2013 11 04 03 2013 11 07 05 28.40 0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2013 11 07 16 2013 11 11 03 28.60 0.37 0.10 0.00 0.5 -176.5 Howland and Baker 2013 11 11 03 2013 11 14 05 28.60 0.39 0.10 0.00 0.5 -176.5 Howland and Baker 2013 11 14 05 2013 11 18 03 28.50 0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2013 11 18 03 2013 11 21 03 28.60 0.38 0.10 0.00 0.5 -176.5 Howland and Baker 2013 11 21 03 2013 11 25 05 28.50 0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2013 11 25 05 2013 11 28 03 28.50 0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2013 11 28 03 2013 12 02 03 28.40 0.14 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 02 03 2013 12 05 05 28.00 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 05 05 2013 12 09 04 28.50 0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 09 04 2013 12 12 05 28.30 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 12 05 2013 12 16 03 27.90 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 16 03 2013 12 19 04 27.80 -0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 19 04 2013 12 23 05 27.70 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 23 05 2013 12 26 03 27.90 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 26 03 2013 12 30 05 27.70 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2013 12 30 05 2014 01 02 05 27.70 -0.48 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 02 05 2014 01 06 04 27.80 -0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 06 04 2014 01 09 05 27.70 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 09 05 2014 01 13 03 27.60 -0.51 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 13 03 2014 01 15 22 27.50 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 16 22 2014 01 20 05 27.20 -0.83 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 20 05 2014 01 23 03 27.50 -0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 23 03 2014 01 27 05 27.50 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 27 05 2014 01 30 04 27.50 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2014 01 30 04 2014 02 03 03 27.70 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 03 03 2014 02 06 05 27.50 -0.31 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 06 05 2014 02 10 03 28.00 0.25 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 10 03 2014 02 13 03 28.00 0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 13 03 2014 02 17 05 27.90 0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 17 05 2014 02 20 03 27.90 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 20 03 2014 02 24 05 27.80 0.17 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 24 05 2014 02 27 04 28.10 0.49 0.00 0.00 0.5 -176.5 Howland and Baker 2014 02 27 04 2014 03 03 03 28.10 0.52 0.00 0.00 0.5 -176.5 Howland and Baker 2014 03 03 03 2014 03 06 05 28.00 0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2014 03 06 05 2014 03 10 03 28.00 0.47 0.00 0.00 0.5 -176.5 Howland and Baker 2014 03 10 03 2014 03 13 03 28.50 0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2014 03 13 03 2014 03 17 04 28.50 0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2014 03 17 04 2014 03 20 03 29.60 2.07 1.10 0.55 0.5 -176.5 Howland and Baker 2014 03 20 03 2014 03 24 05 29.60 2.04 1.10 1.10 0.5 -176.5 Howland and Baker 2014 03 24 05 2014 03 27 04 29.60 2.02 1.10 1.65 0.5 -176.5 Howland and Baker 2014 03 27 04 2014 03 31 03 29.70 2.10 1.20 2.25 0.5 -176.5 Howland and Baker 2014 03 31 03 2014 04 03 04 29.70 2.08 1.20 2.85 0.5 -176.5 Howland and Baker 2014 04 03 04 2014 04 07 03 29.50 1.85 1.00 3.35 0.5 -176.5 Howland and Baker 2014 04 07 03 2014 04 10 03 29.60 1.93 1.10 3.90 0.5 -176.5 Howland and Baker 2014 04 10 03 2014 04 14 04 29.60 1.91 1.10 4.45 0.5 -176.5 Howland and Baker 2014 04 14 04 2014 04 17 03 29.60 1.87 1.10 5.00 0.5 -176.5 Howland and Baker 2014 04 17 03 2014 04 21 05 29.60 1.82 1.10 5.55 0.5 -176.5 Howland and Baker 2014 04 21 05 2014 04 24 04 29.50 1.68 1.00 6.05 0.5 -176.5 Howland and Baker 2014 04 24 04 2014 04 28 03 29.50 1.63 1.00 6.55 0.5 -176.5 Howland and Baker 2014 04 28 03 2014 05 01 04 29.50 1.59 1.00 7.05 0.5 -176.5 Howland and Baker 2014 05 01 04 2014 05 05 03 29.80 1.83 1.30 7.70 0.5 -176.5 Howland and Baker 2014 05 05 03 2014 05 08 04 30.00 1.99 1.50 8.45 0.5 -176.5 Howland and Baker 2014 05 08 04 2014 05 12 04 30.00 1.94 1.50 9.20 0.5 -176.5 Howland and Baker 2014 05 12 04 2014 05 15 03 29.90 1.80 1.40 9.90 0.5 -176.5 Howland and Baker 2014 05 15 03 2014 05 19 04 29.80 1.69 1.30 10.55 0.5 -176.5 Howland and Baker 2014 05 19 04 2014 05 22 04 29.70 1.58 1.20 11.15 0.5 -176.5 Howland and Baker 2014 05 22 04 2014 05 26 05 29.90 1.76 1.40 11.85 0.5 -176.5 Howland and Baker 2014 05 26 05 2014 05 29 04 30.20 2.05 1.70 12.70 0.5 -176.5 Howland and Baker 2014 05 29 04 2014 06 02 03 29.80 1.64 1.30 13.35 0.5 -176.5 Howland and Baker 2014 06 02 03 2014 06 05 04 30.00 1.83 1.50 14.10 0.5 -176.5 Howland and Baker 2014 06 05 04 2014 06 09 04 29.90 1.72 1.40 14.80 0.5 -176.5 Howland and Baker 2014 06 09 04 2014 06 12 03 29.70 1.51 1.20 14.85 0.5 -176.5 Howland and Baker 2014 06 12 03 2014 06 16 04 29.20 0.99 0.70 14.30 0.5 -176.5 Howland and Baker 2014 06 19 03 2014 06 23 04 29.00 0.75 0.50 13.75 0.5 -176.5 Howland and Baker 2014 06 23 04 2014 06 26 04 29.00 0.73 0.50 13.15 0.5 -176.5 Howland and Baker 2014 06 26 04 2014 06 30 03 29.00 0.70 0.50 12.55 0.5 -176.5 Howland and Baker 2014 06 30 03 2014 07 03 04 28.80 0.48 0.30 12.05 0.5 -176.5 Howland and Baker 2014 07 03 04 2014 07 07 04 28.80 0.45 0.30 11.50 0.5 -176.5 Howland and Baker 2014 07 07 04 2014 07 10 03 28.70 0.33 0.20 10.95 0.5 -176.5 Howland and Baker 2014 07 10 03 2014 07 14 04 28.60 0.21 0.10 10.40 0.5 -176.5 Howland and Baker 2014 07 14 04 2014 07 17 03 29.20 0.80 0.70 9.85 0.5 -176.5 Howland and Baker 2014 07 17 03 2014 07 21 04 29.10 0.70 0.60 9.35 0.5 -176.5 Howland and Baker 2014 07 21 04 2014 07 24 04 28.80 0.40 0.30 8.85 0.5 -176.5 Howland and Baker 2014 07 24 04 2014 07 28 03 28.50 0.10 0.00 8.35 0.5 -176.5 Howland and Baker 2014 07 28 03 2014 07 31 04 28.60 0.20 0.10 7.70 0.5 -176.5 Howland and Baker 2014 07 31 04 2014 08 04 03 29.10 0.70 0.60 6.95 0.5 -176.5 Howland and Baker 2014 08 04 03 2014 08 07 05 29.40 1.00 0.90 6.20 0.5 -176.5 Howland and Baker 2014 08 07 05 2014 08 11 04 29.20 0.80 0.70 5.50 0.5 -176.5 Howland and Baker 2014 08 11 04 2014 08 14 03 29.10 0.70 0.60 4.85 0.5 -176.5 Howland and Baker 2014 08 14 03 2014 08 18 04 28.80 0.39 0.30 4.25 0.5 -176.5 Howland and Baker 2014 08 18 04 2014 08 21 03 28.90 0.48 0.40 3.55 0.5 -176.5 Howland and Baker 2014 08 21 03 2014 08 25 03 28.80 0.37 0.30 2.70 0.5 -176.5 Howland and Baker 2014 08 25 03 2014 08 28 04 29.20 0.76 0.70 2.05 0.5 -176.5 Howland and Baker 2014 08 28 04 2014 09 01 03 28.90 0.45 0.40 1.30 0.5 -176.5 Howland and Baker 2014 09 01 03 2014 09 04 04 28.80 0.34 0.30 0.60 0.5 -176.5 Howland and Baker 2014 09 04 04 2014 09 08 03 28.70 0.22 0.20 0.00 0.5 -176.5 Howland and Baker 2014 09 08 03 2014 09 11 03 28.90 0.41 0.40 0.00 0.5 -176.5 Howland and Baker 2014 09 11 03 2014 09 15 04 28.70 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2014 09 15 04 2014 09 18 03 29.30 0.81 0.80 0.00 0.5 -176.5 Howland and Baker 2014 09 18 03 2014 09 22 05 29.10 0.62 0.60 0.00 0.5 -176.5 Howland and Baker 2014 09 22 05 2014 09 25 04 28.90 0.43 0.40 0.00 0.5 -176.5 Howland and Baker 2014 09 25 04 2014 09 29 03 28.80 0.35 0.30 0.00 0.5 -176.5 Howland and Baker 2014 09 29 03 2014 10 02 05 28.70 0.26 0.20 0.00 0.5 -176.5 Howland and Baker 2014 10 02 05 2014 10 06 03 28.30 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2014 10 06 03 2014 10 09 03 28.40 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2014 10 09 03 2014 10 13 04 28.60 0.19 0.10 0.00 0.5 -176.5 Howland and Baker 2014 10 13 04 2014 10 16 03 29.00 0.61 0.50 0.00 0.5 -176.5 Howland and Baker 2014 10 16 03 2014 10 20 05 29.30 0.93 0.80 0.00 0.5 -176.5 Howland and Baker 2014 10 20 05 2014 10 23 03 28.90 0.55 0.40 0.00 0.5 -176.5 Howland and Baker 2014 10 23 03 2014 10 27 03 28.90 0.58 0.40 0.00 0.5 -176.5 Howland and Baker 2014 10 27 03 2014 10 30 05 28.90 0.60 0.40 0.00 0.5 -176.5 Howland and Baker 2014 10 30 05 2014 11 03 03 28.90 0.62 0.40 0.00 0.5 -176.5 Howland and Baker 2014 11 03 03 2014 11 06 05 29.10 0.84 0.60 0.00 0.5 -176.5 Howland and Baker 2014 11 06 05 2014 11 10 03 29.40 1.17 0.90 0.00 0.5 -176.5 Howland and Baker 2014 11 10 03 2014 11 13 03 29.20 0.99 0.70 0.00 0.5 -176.5 Howland and Baker 2014 11 13 03 2014 11 17 04 29.10 0.89 0.60 0.00 0.5 -176.5 Howland and Baker 2014 11 17 04 2014 11 20 04 29.00 0.78 0.50 0.00 0.5 -176.5 Howland and Baker 2014 11 20 04 2014 11 24 03 29.20 0.97 0.70 0.00 0.5 -176.5 Howland and Baker 2014 11 24 03 2014 11 27 04 29.10 0.86 0.60 0.00 0.5 -176.5 Howland and Baker 2014 11 27 04 2014 12 01 04 29.10 0.85 0.60 0.00 0.5 -176.5 Howland and Baker 2014 12 01 04 2014 12 04 05 29.10 0.84 0.60 0.00 0.5 -176.5 Howland and Baker 2014 12 04 05 2014 12 08 03 29.10 0.82 0.60 0.00 0.5 -176.5 Howland and Baker 2014 12 08 03 2014 12 11 04 29.40 1.11 0.90 0.00 0.5 -176.5 Howland and Baker 2014 12 11 04 2014 12 15 04 29.40 1.10 0.90 0.00 0.5 -176.5 Howland and Baker 2014 12 15 04 2014 12 18 03 29.40 1.12 0.90 0.00 0.5 -176.5 Howland and Baker 2014 12 18 03 2014 12 22 05 29.30 1.05 0.80 0.00 0.5 -176.5 Howland and Baker 2014 12 22 05 2014 12 25 04 29.20 0.96 0.70 0.00 0.5 -176.5 Howland and Baker 2014 12 25 04 2014 12 29 04 29.10 0.89 0.60 0.00 0.5 -176.5 Howland and Baker 2014 12 29 04 2015 01 01 05 29.10 0.91 0.60 0.00 0.5 -176.5 Howland and Baker 2015 01 01 05 2015 01 05 03 28.60 0.44 0.10 0.00 0.5 -176.5 Howland and Baker 2015 01 05 03 2015 01 08 03 28.60 0.45 0.10 0.00 0.5 -176.5 Howland and Baker 2015 01 08 03 2015 01 12 04 28.80 0.68 0.30 0.00 0.5 -176.5 Howland and Baker 2015 01 12 04 2015 01 15 03 28.70 0.60 0.20 0.00 0.5 -176.5 Howland and Baker 2015 01 15 03 2015 01 19 05 29.00 0.95 0.50 0.00 0.5 -176.5 Howland and Baker 2015 01 19 05 2015 01 22 03 29.50 1.49 1.00 0.50 0.5 -176.5 Howland and Baker 2015 01 22 03 2015 01 26 03 29.10 1.15 0.60 0.50 0.5 -176.5 Howland and Baker 2015 01 26 03 2015 01 29 04 29.10 1.19 0.60 0.50 0.5 -176.5 Howland and Baker 2015 01 29 04 2015 02 02 03 28.90 1.04 0.40 0.50 0.5 -176.5 Howland and Baker 2015 02 02 03 2015 02 05 05 28.90 1.08 0.40 0.50 0.5 -176.5 Howland and Baker 2015 02 05 05 2015 02 09 04 28.90 1.13 0.40 0.50 0.5 -176.5 Howland and Baker 2015 02 09 04 2015 02 12 03 28.60 0.87 0.10 0.50 0.5 -176.5 Howland and Baker 2015 02 12 03 2015 02 16 04 28.60 0.91 0.10 0.50 0.5 -176.5 Howland and Baker 2015 02 16 04 2015 02 19 03 28.60 0.93 0.10 0.50 0.5 -176.5 Howland and Baker 2015 02 19 03 2015 02 23 05 28.50 0.86 0.00 0.50 0.5 -176.5 Howland and Baker 2015 02 23 05 2015 02 26 04 29.00 1.38 0.50 0.50 0.5 -176.5 Howland and Baker 2015 02 26 04 2015 03 02 03 29.30 1.71 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 02 03 2015 03 05 04 29.30 1.73 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 05 04 2015 03 09 03 29.30 1.76 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 09 03 2015 03 12 03 29.30 1.78 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 12 03 2015 03 16 04 29.30 1.79 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 16 04 2015 03 19 03 29.30 1.77 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 19 03 2015 03 23 04 29.30 1.75 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 23 04 2015 03 26 04 29.30 1.73 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 26 04 2015 03 30 03 29.30 1.70 0.80 0.50 0.5 -176.5 Howland and Baker 2015 03 30 03 2015 04 02 04 29.30 1.68 0.80 0.50 0.5 -176.5 Howland and Baker 2015 04 02 04 2015 04 06 03 30.20 2.56 1.70 1.35 0.5 -176.5 Howland and Baker 2015 04 06 03 2015 04 09 05 30.20 2.54 1.70 2.20 0.5 -176.5 Howland and Baker 2015 04 09 05 2015 04 13 04 30.20 2.51 1.70 3.05 0.5 -176.5 Howland and Baker 2015 04 13 04 2015 04 16 03 30.10 2.39 1.60 3.35 0.5 -176.5 Howland and Baker 2015 04 16 03 2015 04 20 04 30.10 2.33 1.60 4.15 0.5 -176.5 Howland and Baker 2015 04 20 04 2015 04 23 03 30.10 2.29 1.60 4.95 0.5 -176.5 Howland and Baker 2015 04 23 03 2015 04 27 05 30.10 2.24 1.60 5.75 0.5 -176.5 Howland and Baker 2015 04 27 05 2015 04 30 04 29.90 2.00 1.40 6.45 0.5 -176.5 Howland and Baker 2015 04 30 04 2015 05 04 03 30.10 2.15 1.60 7.25 0.5 -176.5 Howland and Baker 2015 05 04 03 2015 05 07 04 30.10 2.11 1.60 8.05 0.5 -176.5 Howland and Baker 2015 05 07 04 2015 05 11 03 30.10 2.05 1.60 8.85 0.5 -176.5 Howland and Baker 2015 05 11 03 2015 05 14 03 30.10 2.01 1.60 9.65 0.5 -176.5 Howland and Baker 2015 05 14 03 2015 05 18 04 30.10 1.99 1.60 10.45 0.5 -176.5 Howland and Baker 2015 05 18 04 2015 05 21 03 30.10 1.98 1.60 11.25 0.5 -176.5 Howland and Baker 2015 05 21 03 2015 05 25 04 30.10 1.97 1.60 12.05 0.5 -176.5 Howland and Baker 2015 05 25 04 2015 05 28 04 30.00 1.86 1.50 12.80 0.5 -176.5 Howland and Baker 2015 05 28 04 2015 06 01 03 30.20 2.05 1.70 13.65 0.5 -176.5 Howland and Baker 2015 06 01 03 2015 06 04 04 30.40 2.24 1.90 14.60 0.5 -176.5 Howland and Baker 2015 06 04 04 2015 06 08 03 30.40 2.22 1.90 15.55 0.5 -176.5 Howland and Baker 2015 06 08 03 2015 06 11 04 30.40 2.21 1.90 16.50 0.5 -176.5 Howland and Baker 2015 06 11 04 2015 06 15 04 30.00 1.80 1.50 17.25 0.5 -176.5 Howland and Baker 2015 06 15 04 2015 06 18 03 30.00 1.78 1.50 18.00 0.5 -176.5 Howland and Baker 2015 06 18 03 2015 06 22 02 30.00 1.75 1.50 18.75 0.5 -176.5 Howland and Baker 2015 06 22 02 2015 06 25 03 30.00 1.73 1.50 19.50 0.5 -176.5 Howland and Baker 2015 06 25 03 2015 06 29 04 30.00 1.71 1.50 19.40 0.5 -176.5 Howland and Baker 2015 06 29 04 2015 07 02 04 30.00 1.69 1.50 19.30 0.5 -176.5 Howland and Baker 2015 07 02 04 2015 07 06 03 30.30 1.96 1.80 19.35 0.5 -176.5 Howland and Baker 2015 07 06 03 2015 07 09 04 30.10 1.74 1.60 19.35 0.5 -176.5 Howland and Baker 2015 07 09 04 2015 07 13 03 30.00 1.61 1.50 19.30 0.5 -176.5 Howland and Baker 2015 07 13 03 2015 07 16 03 30.00 1.60 1.50 19.25 0.5 -176.5 Howland and Baker 2015 07 16 03 2015 07 20 04 30.00 1.60 1.50 19.20 0.5 -176.5 Howland and Baker 2015 07 20 04 2015 07 23 03 29.90 1.50 1.40 19.20 0.5 -176.5 Howland and Baker 2015 07 23 03 2015 07 27 04 29.90 1.50 1.40 19.10 0.5 -176.5 Howland and Baker 2015 07 27 04 2015 07 30 04 30.00 1.60 1.50 19.05 0.5 -176.5 Howland and Baker 2015 07 30 04 2015 08 03 05 30.10 1.70 1.60 19.05 0.5 -176.5 Howland and Baker 2015 08 03 05 2015 08 06 04 30.10 1.70 1.60 19.05 0.5 -176.5 Howland and Baker 2015 08 06 04 2015 08 10 03 30.10 1.70 1.60 19.05 0.5 -176.5 Howland and Baker 2015 08 10 03 2015 08 13 05 30.10 1.70 1.60 19.05 0.5 -176.5 Howland and Baker 2015 08 13 05 2015 08 17 04 30.00 1.59 1.50 19.00 0.5 -176.5 Howland and Baker 2015 08 17 04 2015 08 20 03 30.10 1.68 1.60 19.05 0.5 -176.5 Howland and Baker 2015 08 20 03 2015 08 24 04 30.10 1.67 1.60 19.00 0.5 -176.5 Howland and Baker 2015 08 24 04 2015 08 27 03 30.10 1.66 1.60 18.85 0.5 -176.5 Howland and Baker 2015 08 27 03 2015 08 31 05 30.10 1.65 1.60 18.70 0.5 -176.5 Howland and Baker 2015 08 31 05 2015 09 03 04 30.10 1.64 1.60 18.55 0.5 -176.5 Howland and Baker 2015 09 03 04 2015 09 07 03 29.90 1.43 1.40 18.50 0.5 -176.5 Howland and Baker 2015 09 07 03 2015 09 10 04 30.20 1.72 1.70 18.60 0.5 -176.5 Howland and Baker 2015 09 10 04 2015 09 14 03 30.20 1.70 1.70 18.70 0.5 -176.5 Howland and Baker 2015 09 14 03 2015 09 17 05 30.20 1.71 1.70 18.80 0.5 -176.5 Howland and Baker 2015 09 17 05 2015 09 21 03 30.40 1.92 1.90 19.00 0.5 -176.5 Howland and Baker 2015 09 21 03 2015 09 24 03 30.40 1.93 1.90 19.20 0.5 -176.5 Howland and Baker 2015 09 24 03 2015 09 28 04 30.40 1.94 1.90 19.25 0.5 -176.5 Howland and Baker 2015 09 28 04 2015 10 01 03 30.30 1.85 1.80 19.35 0.5 -176.5 Howland and Baker 2015 10 01 03 2015 10 05 05 30.30 1.87 1.80 19.50 0.5 -176.5 Howland and Baker 2015 10 05 05 2015 10 08 04 30.10 1.68 1.60 19.55 0.5 -176.5 Howland and Baker 2015 10 08 04 2015 10 12 03 30.10 1.69 1.60 19.60 0.5 -176.5 Howland and Baker 2015 10 12 03 2015 10 15 04 30.10 1.70 1.60 19.70 0.5 -176.5 Howland and Baker 2015 10 15 04 2015 10 19 03 30.00 1.63 1.50 19.75 0.5 -176.5 Howland and Baker 2015 10 19 03 2015 10 22 03 30.00 1.65 1.50 19.75 0.5 -176.5 Howland and Baker 2015 10 22 03 2015 10 26 03 29.80 1.47 1.30 19.60 0.5 -176.5 Howland and Baker 2015 10 26 03 2015 10 29 03 29.60 1.29 1.10 19.35 0.5 -176.5 Howland and Baker 2015 10 29 03 2015 11 02 04 30.10 1.82 1.60 19.35 0.5 -176.5 Howland and Baker 2015 11 02 04 2015 11 05 03 30.30 2.04 1.80 19.45 0.5 -176.5 Howland and Baker 2015 11 05 03 2015 11 09 03 30.30 2.06 1.80 19.60 0.5 -176.5 Howland and Baker 2015 11 09 03 2015 11 12 04 30.30 2.08 1.80 19.70 0.5 -176.5 Howland and Baker 2015 11 12 04 2015 11 16 03 30.30 2.10 1.80 19.80 0.5 -176.5 Howland and Baker 2015 11 16 03 2015 11 19 04 30.30 2.09 1.80 19.90 0.5 -176.5 Howland and Baker 2015 11 19 04 2015 11 23 04 30.50 2.27 2.00 20.10 0.5 -176.5 Howland and Baker 2015 11 23 04 2015 11 26 04 30.50 2.26 2.00 20.30 0.5 -176.5 Howland and Baker 2015 11 26 04 2015 11 30 04 30.50 2.25 2.00 20.60 0.5 -176.5 Howland and Baker 2015 11 30 04 2015 12 03 04 30.50 2.24 2.00 20.75 0.5 -176.5 Howland and Baker 2015 12 03 04 2015 12 07 04 30.50 2.23 2.00 20.90 0.5 -176.5 Howland and Baker 2015 12 07 04 2015 12 10 04 30.40 2.12 1.90 21.00 0.5 -176.5 Howland and Baker 2015 12 10 04 2015 12 14 04 30.70 2.40 2.20 21.15 0.5 -176.5 Howland and Baker 2015 12 14 04 2015 12 17 04 30.70 2.41 2.20 21.30 0.5 -176.5 Howland and Baker 2015 12 17 04 2015 12 21 04 30.70 2.44 2.20 21.45 0.5 -176.5 Howland and Baker 2015 12 21 04 2015 12 24 05 30.70 2.46 2.20 21.65 0.5 -176.5 Howland and Baker 2015 12 24 05 2015 12 28 04 30.70 2.48 2.20 21.85 0.5 -176.5 Howland and Baker 2015 12 28 04 2015 12 31 04 30.70 2.50 2.20 22.15 0.5 -176.5 Howland and Baker 2015 12 31 04 2016 01 04 04 30.70 2.53 2.20 22.45 0.5 -176.5 Howland and Baker 2016 01 04 04 2016 01 07 04 30.70 2.55 2.20 22.75 0.5 -176.5 Howland and Baker 2016 01 07 04 2016 01 11 04 29.60 1.47 1.10 22.55 0.5 -176.5 Howland and Baker 2016 01 11 04 2016 01 14 04 29.20 1.09 0.70 21.80 0.5 -176.5 Howland and Baker 2016 01 14 04 2016 01 18 04 29.20 1.14 0.70 21.15 0.5 -176.5 Howland and Baker 2016 01 18 04 2016 01 21 04 29.20 1.18 0.70 20.60 0.5 -176.5 Howland and Baker 2016 01 21 04 2016 01 25 03 29.20 1.23 0.70 19.80 0.5 -176.5 Howland and Baker 2016 01 25 03 2016 01 28 03 29.20 1.27 0.70 18.90 0.5 -176.5 Howland and Baker 2016 01 28 00 2016 02 01 00 29.20 1.13 0.50 18.00 0.5 -176.5 Howland and Baker 2016 02 01 00 2016 02 04 00 29.10 1.07 0.40 17.10 0.5 -176.5 Howland and Baker 2016 02 04 00 2016 02 08 00 29.20 1.22 0.50 16.20 0.5 -176.5 Howland and Baker 2016 02 08 00 2016 02 11 00 29.00 1.06 0.30 15.30 0.5 -176.5 Howland and Baker 2016 02 11 00 2016 02 15 00 29.00 1.10 0.30 14.30 0.5 -176.5 Howland and Baker 2016 02 15 00 2016 02 18 00 28.40 0.51 0.00 13.30 0.5 -176.5 Howland and Baker 2016 02 18 00 2016 02 22 00 28.60 0.73 0.00 12.30 0.5 -176.5 Howland and Baker 2016 02 22 00 2016 02 25 00 28.90 1.04 0.20 11.30 0.5 -176.5 Howland and Baker 2016 02 25 00 2016 02 29 00 29.30 1.45 0.60 10.30 0.5 -176.5 Howland and Baker 2016 02 29 00 2016 03 03 00 29.60 1.76 0.90 9.35 0.5 -176.5 Howland and Baker 2016 03 03 00 2016 03 07 00 29.50 1.68 0.80 8.25 0.5 -176.5 Howland and Baker 2016 03 07 00 2016 03 10 00 29.70 1.89 1.00 7.65 0.5 -176.5 Howland and Baker 2016 03 10 00 2016 03 14 00 29.80 2.00 1.10 7.10 0.5 -176.5 Howland and Baker 2016 03 14 00 2016 03 17 00 29.90 2.08 1.20 6.60 0.5 -176.5 Howland and Baker 2016 03 17 00 2016 03 21 00 29.70 1.85 1.00 6.00 0.5 -176.5 Howland and Baker 2016 03 21 00 2016 03 24 00 29.80 1.94 1.10 5.45 0.5 -176.5 Howland and Baker 2016 03 24 00 2016 03 28 00 29.30 1.41 0.60 4.35 0.5 -176.5 Howland and Baker 2016 03 28 00 2016 03 31 00 29.30 1.39 0.60 3.25 0.5 -176.5 Howland and Baker 2016 03 31 00 2016 04 04 00 29.20 1.26 0.50 2.70 0.5 -176.5 Howland and Baker 2016 04 04 00 2016 04 07 00 28.90 0.95 0.20 2.70 0.5 -176.5 Howland and Baker 2016 04 07 00 2016 04 11 00 28.60 0.62 0.00 2.70 0.5 -176.5 Howland and Baker 2016 04 11 00 2016 04 14 00 28.50 0.50 0.00 2.70 0.5 -176.5 Howland and Baker 2016 04 14 00 2016 04 18 00 28.60 0.55 0.00 2.70 0.5 -176.5 Howland and Baker 2016 04 18 00 2016 04 21 00 29.20 1.11 0.50 2.70 0.5 -176.5 Howland and Baker 2016 04 21 00 2016 04 25 00 29.30 1.15 0.60 2.70 0.5 -176.5 Howland and Baker 2016 04 25 00 2016 04 28 00 29.00 0.81 0.30 2.70 0.5 -176.5 Howland and Baker 2016 04 28 00 2016 05 02 00 29.30 1.06 0.60 2.70 0.5 -176.5 Howland and Baker 2016 05 02 00 2016 05 05 00 29.20 0.92 0.50 2.70 0.5 -176.5 Howland and Baker 2016 05 05 00 2016 05 09 00 29.80 1.47 1.10 3.25 0.5 -176.5 Howland and Baker 2016 05 09 00 2016 05 12 00 29.40 1.03 0.70 3.25 0.5 -176.5 Howland and Baker 2016 05 12 00 2016 05 16 00 29.20 0.79 0.50 3.25 0.5 -176.5 Howland and Baker 2016 05 16 00 2016 05 19 00 29.10 0.67 0.40 3.25 0.5 -176.5 Howland and Baker 2016 05 19 00 2016 05 23 00 29.20 0.74 0.50 3.25 0.5 -176.5 Howland and Baker 2016 05 23 00 2016 05 26 00 29.40 0.92 0.70 3.25 0.5 -176.5 Howland and Baker 2016 05 26 00 2016 05 30 00 29.50 1.00 0.80 3.25 0.5 -176.5 Howland and Baker 2016 05 30 00 2016 06 02 00 29.40 0.88 0.70 2.75 0.5 -176.5 Howland and Baker 2016 06 02 00 2016 06 06 00 29.20 0.65 0.50 2.20 0.5 -176.5 Howland and Baker 2016 06 06 00 2016 06 09 00 29.30 0.73 0.60 1.60 0.5 -176.5 Howland and Baker 2016 06 09 00 2016 06 13 00 29.50 0.91 0.80 1.10 0.5 -176.5 Howland and Baker 2016 06 13 00 2016 06 16 00 29.40 0.79 0.70 0.55 0.5 -176.5 Howland and Baker 2016 06 16 00 2016 06 20 00 29.50 0.88 0.80 0.55 0.5 -176.5 Howland and Baker 2016 06 20 00 2016 06 23 00 29.20 0.57 0.50 0.55 0.5 -176.5 Howland and Baker 2016 06 23 00 2016 06 27 00 29.00 0.36 0.30 0.55 0.5 -176.5 Howland and Baker 2016 06 27 00 2016 06 30 00 28.60 -0.05 0.00 0.55 0.5 -176.5 Howland and Baker 2016 06 30 00 2016 07 04 00 29.10 0.43 0.40 0.55 0.5 -176.5 Howland and Baker 2016 07 04 00 2016 07 07 00 29.50 0.82 0.80 0.55 0.5 -176.5 Howland and Baker 2016 07 07 00 2016 07 11 00 29.60 0.91 0.90 0.55 0.5 -176.5 Howland and Baker 2016 07 11 00 2016 07 14 00 29.50 0.80 0.80 0.55 0.5 -176.5 Howland and Baker 2016 07 14 00 2016 07 18 00 29.20 0.50 0.50 0.55 0.5 -176.5 Howland and Baker 2016 07 18 00 2016 07 21 00 29.30 0.60 0.60 0.55 0.5 -176.5 Howland and Baker 2016 07 21 00 2016 07 25 00 29.30 0.60 0.60 0.55 0.5 -176.5 Howland and Baker 2016 07 25 00 2016 07 28 00 29.00 0.30 0.30 0.55 0.5 -176.5 Howland and Baker 2016 07 28 00 2016 08 01 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2016 08 01 00 2016 08 04 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2016 08 04 00 2016 08 08 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2016 08 08 00 2016 08 11 00 28.40 -0.30 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 11 00 2016 08 15 00 28.30 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 15 00 2016 08 18 00 28.50 -0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 18 00 2016 08 22 00 28.40 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 22 00 2016 08 25 00 28.40 -0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 25 00 2016 08 29 00 28.50 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2016 08 29 00 2016 09 01 00 29.00 0.36 0.30 0.00 0.5 -176.5 Howland and Baker 2016 09 01 00 2016 09 05 00 29.00 0.37 0.30 0.00 0.5 -176.5 Howland and Baker 2016 09 05 00 2016 09 08 00 28.60 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 08 00 2016 09 12 00 28.70 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 12 00 2016 09 15 00 28.50 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 15 00 2016 09 19 00 28.10 -0.52 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 19 00 2016 09 22 00 28.20 -0.43 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 22 00 2016 09 26 00 27.60 -1.04 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 26 00 2016 09 29 00 27.70 -0.95 0.00 0.00 0.5 -176.5 Howland and Baker 2016 09 29 00 2016 10 03 00 28.10 -0.56 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 03 00 2016 10 06 00 28.10 -0.57 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 06 00 2016 10 10 00 27.70 -0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 10 00 2016 10 13 00 27.80 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 13 00 2016 10 17 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 17 00 2016 10 20 00 28.10 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 20 00 2016 10 24 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 24 00 2016 10 27 00 27.80 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 27 00 2016 10 31 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2016 10 31 00 2016 11 03 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 03 00 2016 11 07 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 07 00 2016 11 10 00 27.70 -1.00 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 10 00 2016 11 14 00 27.50 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 14 00 2016 11 17 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 17 00 2016 11 21 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 21 00 2016 11 24 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 24 00 2016 11 28 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 11 28 00 2016 12 01 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 01 00 2016 12 05 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 05 00 2016 12 08 00 28.30 -0.40 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 08 00 2016 12 12 00 28.10 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 12 00 2016 12 15 00 27.70 -0.99 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 15 00 2016 12 19 00 27.70 -0.94 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 19 00 2016 12 22 00 27.80 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 22 00 2016 12 26 00 27.70 -0.85 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 26 00 2016 12 29 00 27.70 -0.81 0.00 0.00 0.5 -176.5 Howland and Baker 2016 12 29 00 2017 01 02 00 27.60 -0.87 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 02 00 2017 01 05 00 27.40 -1.03 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 05 00 2017 01 09 00 27.50 -0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 09 00 2017 01 12 00 27.50 -0.84 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 12 00 2017 01 16 00 27.40 -0.89 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 16 00 2017 01 19 00 27.30 -0.95 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 19 00 2017 01 23 00 27.40 -0.79 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 23 00 2017 01 26 00 27.60 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 26 00 2017 01 30 00 27.40 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 01 30 00 2017 02 02 00 27.20 -0.86 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 02 00 2017 02 06 00 27.00 -1.01 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 06 00 2017 02 09 00 26.80 -1.17 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 09 00 2017 02 13 00 26.90 -1.01 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 13 00 2017 02 16 00 26.70 -1.19 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 16 00 2017 02 20 00 27.20 -0.68 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 20 00 2017 02 23 00 27.20 -0.67 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 23 00 2017 02 27 00 27.30 -0.56 0.00 0.00 0.5 -176.5 Howland and Baker 2017 02 27 00 2017 03 02 00 27.40 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 02 00 2017 03 06 00 27.20 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 06 00 2017 03 09 00 27.30 -0.52 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 09 00 2017 03 13 00 27.30 -0.51 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 13 00 2017 03 16 00 27.10 -0.71 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 16 00 2017 03 20 00 27.10 -0.73 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 20 00 2017 03 23 00 27.10 -0.75 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 23 00 2017 03 27 00 27.10 -0.78 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 27 00 2017 03 30 00 27.20 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 03 30 00 2017 04 03 00 27.30 -0.62 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 03 00 2017 04 06 00 27.60 -0.34 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 06 00 2017 04 10 00 27.70 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 10 00 2017 04 13 00 27.70 -0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 13 00 2017 04 17 00 27.80 -0.23 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 17 00 2017 04 20 00 28.10 0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 20 00 2017 04 24 00 28.50 0.38 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 24 00 2017 04 27 00 28.40 0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2017 04 27 00 2017 05 01 00 28.30 0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 01 00 2017 05 04 00 28.40 0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 04 00 2017 05 08 00 28.60 0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 08 00 2017 05 11 00 28.40 0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 11 00 2017 05 15 00 28.40 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 15 00 2017 05 18 00 28.40 -0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 18 00 2017 05 22 00 28.40 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 22 00 2017 05 25 00 28.40 -0.06 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 25 00 2017 05 29 00 28.40 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2017 05 29 00 2017 06 01 00 28.70 0.19 0.00 0.00 0.5 -176.5 Howland and Baker 2017 06 01 00 2017 06 05 00 28.80 0.26 0.10 0.00 0.5 -176.5 Howland and Baker 2017 06 05 00 2017 06 08 00 29.10 0.55 0.40 0.00 0.5 -176.5 Howland and Baker 2017 06 08 00 2017 06 12 00 28.90 0.32 0.20 0.00 0.5 -176.5 Howland and Baker 2017 06 12 00 2017 06 15 00 29.00 0.40 0.30 0.00 0.5 -176.5 Howland and Baker 2017 06 15 00 2017 06 19 00 29.10 0.49 0.40 0.00 0.5 -176.5 Howland and Baker 2017 06 19 00 2017 06 22 00 29.10 0.48 0.40 0.00 0.5 -176.5 Howland and Baker 2017 06 22 00 2017 06 26 00 29.30 0.66 0.60 0.00 0.5 -176.5 Howland and Baker 2017 06 26 00 2017 06 29 00 29.20 0.55 0.50 0.00 0.5 -176.5 Howland and Baker 2017 06 29 00 2017 07 03 00 29.30 0.64 0.60 0.00 0.5 -176.5 Howland and Baker 2017 07 03 00 2017 07 06 00 29.10 0.43 0.40 0.00 0.5 -176.5 Howland and Baker 2017 07 06 00 2017 07 10 00 29.00 0.32 0.30 0.00 0.5 -176.5 Howland and Baker 2017 07 10 00 2017 07 13 00 29.00 0.31 0.30 0.00 0.5 -176.5 Howland and Baker 2017 07 13 00 2017 07 17 00 29.00 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2017 07 17 00 2017 07 20 00 29.10 0.40 0.40 0.00 0.5 -176.5 Howland and Baker 2017 07 20 00 2017 07 24 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2017 07 24 00 2017 07 27 00 28.70 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2017 07 27 00 2017 07 31 00 29.00 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2017 07 31 00 2017 08 03 00 29.00 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2017 08 03 00 2017 08 07 00 28.80 0.10 0.10 0.00 0.5 -176.5 Howland and Baker 2017 08 07 00 2017 08 10 00 28.70 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 10 00 2017 08 14 00 28.50 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 14 00 2017 08 17 00 28.60 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 17 00 2017 08 21 00 28.50 -0.18 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 21 00 2017 08 24 00 28.60 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 24 00 2017 08 28 00 28.70 0.04 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 28 00 2017 08 31 00 28.50 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2017 08 31 00 2017 09 04 00 28.50 -0.14 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 04 00 2017 09 07 00 28.50 -0.13 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 07 00 2017 09 11 00 28.60 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 11 00 2017 09 14 00 28.50 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 14 00 2017 09 18 00 28.20 -0.41 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 18 00 2017 09 21 00 28.40 -0.22 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 21 00 2017 09 25 00 28.30 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 25 00 2017 09 28 00 28.10 -0.54 0.00 0.00 0.5 -176.5 Howland and Baker 2017 09 28 00 2017 10 02 00 27.90 -0.76 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 02 00 2017 10 05 00 28.40 -0.27 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 05 00 2017 10 09 00 28.60 -0.08 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 09 00 2017 10 12 00 28.30 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 12 00 2017 10 16 00 28.20 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 16 00 2017 10 19 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 16 00 2017 10 19 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 19 00 2017 10 23 00 28.10 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 23 00 2017 10 26 00 28.20 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 26 00 2017 10 30 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 10 30 00 2017 11 02 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 02 00 2017 11 06 00 28.20 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 06 00 2017 11 09 00 28.10 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 09 00 2017 11 13 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 13 00 2017 11 16 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 16 00 2017 11 20 00 27.80 -0.90 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 20 00 2017 11 23 00 27.90 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 23 00 2017 11 27 00 28.10 -0.60 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 27 00 2017 11 30 00 28.00 -0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2017 11 30 00 2017 12 04 00 27.70 -1.00 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 04 00 2017 12 07 00 27.50 -1.20 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 07 00 2017 12 11 00 27.40 -1.30 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 11 00 2017 12 14 00 27.30 -1.40 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 14 00 2017 12 18 00 27.50 -1.16 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 18 00 2017 12 21 00 27.40 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 21 00 2017 12 25 00 27.20 -1.37 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 25 00 2017 12 28 00 27.40 -1.13 0.00 0.00 0.5 -176.5 Howland and Baker 2017 12 28 00 2018 01 01 00 27.30 -1.18 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 01 00 2018 01 04 00 27.30 -1.14 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 04 00 2018 01 08 00 27.30 -1.09 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 08 00 2018 01 11 00 27.40 -0.95 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 11 00 2018 01 15 00 27.50 -0.80 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 15 00 2018 01 18 00 27.00 -1.26 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 18 00 2018 01 22 00 27.00 -1.21 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 22 00 2018 01 25 00 26.90 -1.27 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 25 00 2018 01 29 00 26.80 -1.31 0.00 0.00 0.5 -176.5 Howland and Baker 2018 01 29 00 2018 02 01 00 26.80 -1.27 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 01 00 2018 02 05 00 26.80 -1.22 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 05 00 2018 02 08 00 27.10 -0.88 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 08 00 2018 02 12 00 27.60 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 12 00 2018 02 15 00 27.80 -0.10 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 15 00 2018 02 19 00 27.40 -0.48 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 19 00 2018 02 22 00 27.50 -0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 22 00 2018 02 26 00 27.60 -0.26 0.00 0.00 0.5 -176.5 Howland and Baker 2018 02 26 00 2018 03 01 00 27.50 -0.35 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 01 00 2018 03 05 00 27.50 -0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 05 00 2018 03 08 00 27.30 -0.52 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 08 00 2018 03 12 00 27.20 -0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 12 00 2018 03 15 00 27.30 -0.50 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 15 00 2018 03 19 00 27.20 -0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 19 00 2018 03 22 00 27.30 -0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 22 00 2018 03 26 00 27.50 -0.37 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 26 00 2018 03 29 00 27.50 -0.39 0.00 0.00 0.5 -176.5 Howland and Baker 2018 03 29 00 2018 04 02 00 27.60 -0.32 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 02 00 2018 04 05 00 27.50 -0.44 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 05 00 2018 04 09 00 27.60 -0.36 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 09 00 2018 04 12 00 27.90 -0.08 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 12 00 2018 04 16 00 28.00 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 16 00 2018 04 19 00 28.00 -0.05 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 19 00 2018 04 23 00 28.10 -0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 23 00 2018 04 26 00 28.00 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 26 00 2018 04 30 00 28.00 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2018 04 30 00 2018 05 03 00 28.00 -0.24 0.00 0.00 0.5 -176.5 Howland and Baker 2018 05 03 00 2018 05 07 00 28.40 0.11 0.00 0.00 0.5 -176.5 Howland and Baker 2018 05 07 00 2018 05 10 00 29.10 0.77 0.40 0.00 0.5 -176.5 Howland and Baker 2018 05 10 00 2018 05 14 00 28.90 0.51 0.20 0.00 0.5 -176.5 Howland and Baker 2018 05 14 00 2018 05 17 00 28.80 0.39 0.10 0.00 0.5 -176.5 Howland and Baker 2018 05 17 00 2018 05 21 00 28.60 0.16 0.00 0.00 0.5 -176.5 Howland and Baker 2018 05 21 00 2018 05 24 00 28.60 0.14 0.00 0.00 0.5 -176.5 Howland and Baker 2018 05 24 00 2018 05 28 00 28.90 0.42 0.20 0.00 0.5 -176.5 Howland and Baker 2018 05 28 00 2018 05 31 00 28.80 0.30 0.10 0.00 0.5 -176.5 Howland and Baker 2018 05 31 00 2018 06 04 00 28.50 -0.03 0.00 0.00 0.5 -176.5 Howland and Baker 2018 06 04 00 2018 06 07 00 28.40 -0.15 0.00 0.00 0.5 -176.5 Howland and Baker 2018 06 07 00 2018 06 11 00 28.50 -0.07 0.00 0.00 0.5 -176.5 Howland and Baker 2018 06 11 00 2018 06 14 00 28.60 0.01 0.00 0.00 0.5 -176.5 Howland and Baker 2018 06 14 00 2018 06 18 00 28.90 0.29 0.20 0.00 0.5 -176.5 Howland and Baker 2018 06 18 00 2018 06 21 00 29.00 0.38 0.30 0.00 0.5 -176.5 Howland and Baker 2018 06 21 00 2018 06 25 00 29.00 0.37 0.30 0.00 0.5 -176.5 Howland and Baker 2018 06 25 00 2018 06 28 00 29.00 0.36 0.30 0.00 0.5 -176.5 Howland and Baker 2018 06 28 00 2018 07 02 00 29.00 0.34 0.30 0.00 0.5 -176.5 Howland and Baker 2018 07 02 00 2018 07 05 00 28.80 0.13 0.10 0.00 0.5 -176.5 Howland and Baker 2018 07 05 00 2018 07 09 00 28.70 0.02 0.00 0.00 0.5 -176.5 Howland and Baker 2018 07 09 00 2018 07 12 00 28.60 -0.09 0.00 0.00 0.5 -176.5 Howland and Baker 2018 07 12 00 2018 07 16 00 28.50 -0.20 0.00 0.00 0.5 -176.5 Howland and Baker 2018 07 16 00 2018 07 19 00 28.70 0.00 0.00 0.00 0.5 -176.5 Howland and Baker 2018 07 19 00 2018 07 23 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2018 07 23 00 2018 07 26 00 28.90 0.20 0.20 0.00 0.5 -176.5 Howland and Baker 2018 07 26 00 2018 07 30 00 28.80 0.10 0.10 0.00 0.5 -176.5 Howland and Baker 2018 07 30 00 2018 08 02 00 29.10 0.40 0.40 0.00 0.5 -176.5 Howland and Baker 2018 08 02 00 2018 08 06 00 29.10 0.40 0.40 0.00 0.5 -176.5 Howland and Baker 2018 08 06 00 2018 08 09 00 29.00 0.30 0.30 0.00 0.5 -176.5 Howland and Baker 2018 08 09 00 2018 08 13 00 29.20 0.50 0.50 0.00 0.5 -176.5 Howland and Baker 2018 08 13 00 2018 08 16 00 29.60 0.90 0.90 0.00 0.5 -176.5 Howland and Baker 2018 08 16 00 2018 08 20 00 29.20 0.52 0.50 0.00 0.5 -176.5 Howland and Baker 2018 08 20 00 2018 08 23 00 29.10 0.43 0.40 0.00 0.5 -176.5 Howland and Baker 2018 08 23 00 2018 08 27 00 29.00 0.34 0.30 0.00 0.5 -176.5 Howland and Baker 2018 08 27 00 2018 08 30 00 28.90 0.25 0.20 0.00 0.5 -176.5 Howland and Baker 2018 08 30 00 2018 09 03 00 28.80 0.16 0.10 0.00 0.5 -176.5 Howland and Baker 2018 09 03 00 2018 09 06 00 28.90 0.27 0.20 0.00 0.5 -176.5 Howland and Baker 2018 09 06 00 2018 09 10 00 29.00 0.38 0.30 0.00 0.5 -176.5 Howland and Baker 2018 09 10 00 2018 09 13 00 29.20 0.59 0.50 0.00 0.5 -176.5 Howland and Baker 2018 09 13 00 2018 09 17 00 29.10 0.49 0.40 0.00 0.5 -176.5 Howland and Baker 2018 09 17 00 2018 09 20 00 28.90 0.28 0.20 0.00 0.5 -176.5 Howland and Baker 2018 09 20 00 2018 09 24 00 28.90 0.27 0.20 0.00 0.5 -176.5 Howland and Baker 2018 09 24 00 2018 09 27 00 29.50 0.86 0.80 0.00 0.5 -176.5 Howland and Baker 2018 09 27 00 2018 10 01 00 29.70 1.05 1.00 0.50 0.5 -176.5 Howland and Baker 2018 10 01 00 2018 10 04 00 29.80 1.14 1.10 1.05 0.5 -176.5 Howland and Baker 2018 10 04 00 2018 10 08 00 29.70 1.02 1.00 1.55 0.5 -176.5 Howland and Baker 2018 10 08 00 2018 10 11 00 29.60 0.91 0.90 1.55 0.5 -176.5 Howland and Baker 2018 10 11 00 2018 10 15 00 29.40 0.70 0.70 1.55 0.5 -176.5 Howland and Baker 2018 10 15 00 2018 10 18 00 29.10 0.40 0.40 1.55 0.5 -176.5 Howland and Baker 2018 10 18 00 2018 10 22 00 29.10 0.40 0.40 1.55 0.5 -176.5 Howland and Baker 2018 10 22 00 2018 10 25 00 29.20 0.50 0.50 1.55 0.5 -176.5 Howland and Baker 2018 10 25 00 2018 10 29 00 29.50 0.80 0.80 1.55 0.5 -176.5 Howland and Baker 2018 10 29 00 2018 11 01 00 29.70 1.00 1.00 2.05 0.5 -176.5 Howland and Baker 2018 11 01 00 2018 11 05 00 29.70 1.00 1.00 2.55 0.5 -176.5 Howland and Baker 2018 11 05 00 2018 11 08 00 29.50 0.80 0.80 2.55 0.5 -176.5 Howland and Baker 2018 11 08 00 2018 11 12 00 29.60 0.90 0.90 2.55 0.5 -176.5 Howland and Baker 2018 11 12 00 2018 11 15 00 29.10 0.40 0.40 2.55 0.5 -176.5 Howland and Baker 2018 11 15 00 2018 11 19 00 29.20 0.50 0.50 2.55 0.5 -176.5 Howland and Baker 2018 11 19 00 2018 11 22 00 29.00 0.30 0.30 2.55 0.5 -176.5 Howland and Baker 2018 11 22 00 2018 11 26 00 29.10 0.40 0.40 2.55 0.5 -176.5 Howland and Baker 2018 11 26 00 2018 11 29 00 29.20 0.50 0.50 2.55 0.5 -176.5 Howland and Baker 2018 11 29 00 2018 12 03 00 29.40 0.70 0.70 2.55 0.5 -176.5 Howland and Baker 2018 12 03 00 2018 12 06 00 29.50 0.80 0.80 2.55 0.5 -176.5 Howland and Baker 2018 12 06 00 2018 12 10 00 29.80 1.10 1.10 3.10 0.5 -176.5 Howland and Baker 2018 12 10 00 2018 12 13 00 29.60 0.90 0.90 3.10 0.5 -176.5 Howland and Baker 2018 12 13 00 2018 12 17 00 29.50 0.83 0.80 3.10 0.5 -176.5 Howland and Baker 2018 12 17 00 2018 12 20 00 29.20 0.56 0.50 3.10 0.5 -176.5 Howland and Baker 2018 12 20 00 2018 12 24 00 29.00 0.42 0.30 2.60 0.5 -176.5 Howland and Baker 2018 12 24 00 2018 12 27 00 29.10 0.55 0.40 2.05 0.5 -176.5 Howland and Baker 2018 12 27 00 2018 12 31 00 29.10 0.61 0.40 1.55 0.5 -176.5 Howland and Baker 2018 12 31 00 2019 01 03 00 29.10 0.65 0.40 1.55 0.5 -176.5 Howland and Baker 2019 01 03 00 2019 01 07 00 29.10 0.70 0.40 1.55 0.5 -176.5 Howland and Baker 2019 01 07 00 2019 01 10 00 28.80 0.44 0.10 1.55 0.5 -176.5 Howland and Baker 2019 01 10 00 2019 01 14 00 29.00 0.69 0.30 1.55 0.5 -176.5 Howland and Baker 2019 01 14 00 2019 01 17 00 29.10 0.83 0.40 1.55 0.5 -176.5 Howland and Baker 2019 01 17 00 2019 01 21 00 29.50 1.28 0.80 1.55 0.5 -176.5 Howland and Baker 2019 01 21 00 2019 01 24 00 29.40 1.22 0.70 1.05 0.5 -176.5 Howland and Baker 2019 01 24 00 2019 01 28 00 29.10 0.97 0.40 0.55 0.5 -176.5 Howland and Baker 2019 01 28 00 2019 01 31 00 29.60 1.51 0.90 0.55 0.5 -176.5 Howland and Baker 2019 01 31 00 2019 02 04 00 29.40 1.37 0.70 0.55 0.5 -176.5 Howland and Baker 2019 02 04 00 2019 02 07 00 29.50 1.51 0.80 0.55 0.5 -176.5 Howland and Baker 2019 02 07 00 2019 02 11 00 29.30 1.36 0.60 0.55 0.5 -176.5 Howland and Baker 2019 02 11 00 2019 02 14 00 29.20 1.30 0.50 0.55 0.5 -176.5 Howland and Baker 2019 02 14 00 2019 02 18 00 29.10 1.21 0.40 0.55 0.5 -176.5 Howland and Baker 2019 02 18 00 2019 02 21 00 28.70 0.82 0.00 0.55 0.5 -176.5 Howland and Baker 2019 02 21 00 2019 02 25 00 28.80 0.94 0.10 0.55 0.5 -176.5 Howland and Baker 2019 02 25 00 2019 02 28 00 29.00 1.15 0.30 0.55 0.5 -176.5 Howland and Baker 2019 02 28 00 2019 03 04 00 28.90 1.06 0.20 0.00 0.5 -176.5 Howland and Baker 2019 03 04 00 2019 03 07 00 28.80 0.97 0.10 0.00 0.5 -176.5 Howland and Baker 2019 03 07 00 2019 03 11 00 28.80 0.99 0.10 0.00 0.5 -176.5 Howland and Baker 2019 03 11 00 2019 03 14 00 28.90 1.10 0.20 0.00 0.5 -176.5 Howland and Baker 2019 03 14 00 2019 03 18 00 28.90 1.08 0.20 0.00 0.5 -176.5 Howland and Baker 2019 03 18 00 2019 03 21 00 28.90 1.06 0.20 0.00 0.5 -176.5 Howland and Baker 2019 03 21 00 2019 03 25 00 29.10 1.24 0.40 0.00 0.5 -176.5 Howland and Baker 2019 03 25 00 2019 03 28 00 29.10 1.22 0.40 0.00 0.5 -176.5 Howland and Baker 2019 03 28 00 2019 04 01 00 29.00 1.09 0.30 0.00 0.5 -176.5 Howland and Baker 2019 04 01 00 2019 04 04 00 29.20 1.27 0.50 0.00 0.5 -176.5 Howland and Baker 2019 04 04 00 2019 04 08 00 28.50 0.55 0.00 0.00 0.5 -176.5 Howland and Baker 2019 04 08 00 2019 04 11 00 29.20 1.23 0.50 0.00 0.5 -176.5 Howland and Baker 2019 04 11 00 2019 04 15 00 28.70 0.70 0.00 0.00 0.5 -176.5 Howland and Baker 2019 04 15 00 2019 04 18 00 28.80 0.76 0.10 0.00 0.5 -176.5 Howland and Baker 2019 04 18 00 2019 04 22 00 28.90 0.81 0.20 0.00 0.5 -176.5 Howland and Baker 2019 04 22 00 2019 04 25 00 29.00 0.87 0.30 0.00 0.5 -176.5 Howland and Baker 2019 04 25 00 2019 04 29 00 29.10 0.91 0.40 0.00 0.5 -176.5 Howland and Baker 2019 04 29 00 2019 05 02 00 29.20 0.97 0.50 0.00 0.5 -176.5 Howland and Baker 2019 05 02 00 2019 05 06 00 29.30 1.02 0.60 0.00 0.5 -176.5 Howland and Baker 2019 05 06 00 2019 05 09 00 29.60 1.28 0.90 0.00 0.5 -176.5 Howland and Baker 2019 05 09 00 2019 05 13 00 29.60 1.23 0.90 0.00 0.5 -176.5 Howland and Baker 2019 05 13 00 2019 05 16 00 29.50 1.09 0.80 0.00 0.5 -176.5 Howland and Baker 2019 05 16 00 2019 05 20 00 29.70 1.27 1.00 0.50 0.5 -176.5 Howland and Baker 2019 05 20 00 2019 05 23 00 29.70 1.25 1.00 1.00 0.5 -176.5 Howland and Baker 2019 05 23 00 2019 05 27 00 29.60 1.12 0.90 1.00 0.5 -176.5 Howland and Baker 2019 05 27 00 2019 05 30 00 29.80 1.30 1.10 1.55 0.5 -176.5 Howland and Baker 2019 05 30 00 2019 06 03 00 29.90 1.38 1.20 2.15 0.5 -176.5 Howland and Baker 2019 06 03 00 2019 06 06 00 30.00 1.46 1.30 2.80 0.5 -176.5 Howland and Baker 2019 06 06 00 2019 06 10 00 30.20 1.63 1.50 3.55 0.5 -176.5 Howland and Baker 2019 06 10 00 2019 06 13 00 30.10 1.51 1.40 4.25 0.5 -176.5 Howland and Baker 2019 06 13 00 2019 06 17 00 30.00 1.39 1.30 4.90 0.5 -176.5 Howland and Baker 2019 06 17 00 2019 06 20 00 29.80 1.18 1.10 5.45 0.5 -176.5 Howland and Baker 2019 06 20 00 2019 06 24 00 29.80 1.17 1.10 6.00 0.5 -176.5 Howland and Baker 2019 06 24 00 2019 06 27 00 29.60 0.96 0.90 6.00 0.5 -176.5 Howland and Baker 2019 06 27 00 2019 07 01 00 29.90 1.25 1.20 6.60 0.5 -176.5 Howland and Baker 2019 07 01 00 2019 07 04 00 29.90 1.24 1.20 7.20 0.5 -176.5 Howland and Baker 2019 07 04 00 2019 07 08 00 30.00 1.32 1.30 7.85 0.5 -176.5 Howland and Baker 2019 07 08 00 2019 07 11 00 30.10 1.41 1.40 8.55 0.5 -176.5 Howland and Baker 2019 07 11 00 2019 07 15 00 30.00 1.30 1.30 9.20 0.5 -176.5 Howland and Baker 2019 07 15 00 2019 07 18 00 30.00 1.30 1.30 9.85 0.5 -176.5 Howland and Baker 2019 07 18 00 2019 07 22 00 30.10 1.40 1.40 10.55 0.5 -176.5 Howland and Baker 2019 07 22 00 2019 07 25 00 30.10 1.40 1.40 11.25 0.5 -176.5 Howland and Baker 2019 07 25 00 2019 07 29 00 30.10 1.40 1.40 11.95 0.5 -176.5 Howland and Baker 2019 07 29 00 2019 08 01 00 29.90 1.20 1.20 12.55 0.5 -176.5 Howland and Baker 2019 08 01 00 2019 08 05 00 29.80 1.10 1.10 13.10 0.5 -176.5 Howland and Baker 2019 08 05 00 2019 08 08 00 29.90 1.20 1.20 13.70 0.5 -176.5 Howland and Baker 2019 08 08 00 2019 08 12 00 29.70 1.00 1.00 13.70 0.5 -176.5 Howland and Baker 2019 08 12 00 2019 08 15 00 29.50 0.80 0.80 13.20 0.5 -176.5 Howland and Baker 2019 08 15 00 2019 08 19 00 29.80 1.11 1.10 13.75 0.5 -176.5 Howland and Baker 2019 08 19 00 2019 08 22 00 29.50 0.82 0.80 13.20 0.5 -176.5 Howland and Baker 2019 08 22 00 2019 08 26 00 29.20 0.54 0.50 12.60 0.5 -176.5 Howland and Baker 2019 08 26 00 2019 08 29 00 29.20 0.55 0.50 11.95 0.5 -176.5 Howland and Baker 2019 08 29 00 2019 09 02 00 29.20 0.56 0.50 11.20 0.5 -176.5 Howland and Baker 2019 09 02 00 2019 09 05 00 29.00 0.37 0.30 10.50 0.5 -176.5 Howland and Baker 2019 09 05 00 2019 09 09 00 28.90 0.28 0.20 9.85 0.5 -176.5 Howland and Baker 2019 09 09 00 2019 09 12 00 28.70 0.09 0.00 9.30 0.5 -176.5 Howland and Baker 2019 09 12 00 2019 09 16 00 28.80 0.20 0.10 8.75 0.5 -176.5 Howland and Baker 2019 09 16 00 2019 09 19 00 29.20 0.59 0.50 8.75 0.5 -176.5 Howland and Baker 2019 09 19 00 2019 09 23 00 29.30 0.67 0.60 8.15 0.5 -176.5 Howland and Baker 2019 09 23 00 2019 09 26 00 29.30 0.66 0.60 7.55 0.5 -176.5 Howland and Baker 2019 09 26 00 2019 09 30 00 29.20 0.55 0.50 6.90 0.5 -176.5 Howland and Baker 2019 09 30 00 2019 10 03 00 29.20 0.54 0.50 6.20 0.5 -176.5 Howland and Baker 2019 10 03 00 2019 10 07 00 29.30 0.63 0.60 5.55 0.5 -176.5 Howland and Baker 2019 10 07 00 2019 10 10 00 29.60 0.92 0.90 4.90 0.5 -176.5 Howland and Baker 2019 10 10 00 2019 10 14 00 30.00 1.30 1.30 4.85 0.5 -176.5 Howland and Baker 2019 10 14 00 2019 10 17 00 29.80 1.10 1.10 4.70 0.5 -176.5 Howland and Baker 2019 10 17 00 2019 10 21 00 29.70 1.00 1.00 4.50 0.5 -176.5 Howland and Baker 2019 10 21 00 2019 10 24 00 29.40 0.70 0.70 3.90 0.5 -176.5 Howland and Baker 2019 10 24 00 2019 10 28 00 29.20 0.50 0.50 3.35 0.5 -176.5 Howland and Baker 2019 10 28 00 2019 10 31 00 29.10 0.40 0.40 2.75 0.5 -176.5 Howland and Baker 2019 10 31 00 2019 11 04 00 29.10 0.40 0.40 2.25 0.5 -176.5 Howland and Baker 2019 11 04 00 2019 11 07 00 29.40 0.70 0.70 2.25 0.5 -176.5 Howland and Baker 2019 11 07 00 2019 11 11 00 29.50 0.80 0.80 1.70 0.5 -176.5 Howland and Baker 2019 11 11 00 2019 11 14 00 29.90 1.20 1.20 2.30 0.5 -176.5 Howland and Baker 2019 11 14 00 2019 11 18 00 29.80 1.10 1.10 2.85 0.5 -176.5 Howland and Baker 2019 11 18 00 2019 11 21 00 29.80 1.10 1.10 3.40 0.5 -176.5 Howland and Baker 2019 11 21 00 2019 11 25 00 29.60 0.90 0.90 3.40 0.5 -176.5 Howland and Baker 2019 11 25 00 2019 11 28 00 29.30 0.60 0.60 3.40 0.5 -176.5 Howland and Baker 2019 11 28 00 2019 12 02 00 29.20 0.50 0.50 3.40 0.5 -176.5 Howland and Baker 2019 12 02 00 2019 12 05 00 29.10 0.40 0.40 3.40 0.5 -176.5 Howland and Baker 2019 12 05 00 2019 12 09 00 29.00 0.30 0.30 3.40 0.5 -176.5 Howland and Baker 2019 12 09 00 2019 12 12 00 29.30 0.60 0.60 3.40 0.5 -176.5 Howland and Baker 2019 12 12 00 2019 12 16 00 29.20 0.51 0.50 3.40 0.5 -176.5 Howland and Baker 2019 12 16 00 2019 12 19 00 29.50 0.85 0.80 3.40 0.5 -176.5 Howland and Baker 2019 12 19 00 2019 12 23 00 29.60 1.00 0.90 3.40 0.5 -176.5 Howland and Baker 2019 12 23 00 2019 12 26 00 29.60 1.04 0.90 3.40 0.5 -176.5 Howland and Baker 2019 12 26 00 2019 12 30 00 29.50 0.99 0.80 3.40 0.5 -176.5 Howland and Baker 2019 12 30 00 2020 01 02 00 29.50 1.03 0.80 3.40 0.5 -176.5 Howland and Baker 2020 01 02 00 2020 01 06 00 29.50 1.08 0.80 2.75 0.5 -176.5 Howland and Baker 2020 01 06 00 2020 01 09 00 29.70 1.32 1.00 2.70 0.5 -176.5 Howland and Baker 2020 01 09 00 2020 01 13 00 29.60 1.27 0.90 2.20 0.5 -176.5 Howland and Baker 2020 01 13 00 2020 01 16 00 29.40 1.11 0.70 2.20 0.5 -176.5 Howland and Baker 2020 01 16 00 2020 01 20 00 29.40 1.17 0.70 2.20 0.5 -176.5 Howland and Baker 2020 01 20 00 2020 01 23 00 29.50 1.31 0.80 2.20 0.5 -176.5 Howland and Baker 2020 01 23 00 2020 01 27 00 29.50 1.36 0.80 2.20 0.5 -176.5 Howland and Baker 2020 01 27 00 2020 01 30 00 29.30 1.20 0.60 2.20 0.5 -176.5 Howland and Baker 2020 01 30 00 2020 02 03 00 29.40 1.35 0.70 2.20 0.5 -176.5 Howland and Baker 2020 02 03 00 2020 02 06 00 29.10 1.09 0.40 1.60 0.5 -176.5 Howland and Baker 2020 02 06 00 2020 02 10 00 29.30 1.35 0.60 1.05 0.5 -176.5 Howland and Baker 2020 02 10 00 2020 02 13 00 29.30 1.39 0.60 0.50 0.5 -176.5 Howland and Baker 2020 02 13 00 2020 02 17 00 29.10 1.21 0.40 0.50 0.5 -176.5 Howland and Baker 2020 02 17 00 2020 02 20 00 29.10 1.22 0.40 0.50 0.5 -176.5 Howland and Baker 2020 02 20 00 2020 02 24 00 29.10 1.23 0.40 0.50 0.5 -176.5 Howland and Baker 2020 02 24 00 2020 02 27 00 29.10 1.24 0.40 0.50 0.5 -176.5 Howland and Baker 2020 02 27 00 2020 03 02 00 29.10 1.26 0.40 0.50 0.5 -176.5 Howland and Baker 2020 03 02 00 2020 03 05 00 28.70 0.87 0.00 0.50 0.5 -176.5 Howland and Baker 2020 03 05 00 2020 03 09 00 28.80 0.98 0.10 0.50 0.5 -176.5 Howland and Baker 2020 03 09 00 2020 03 12 00 28.80 0.99 0.10 0.50 0.5 -176.5 Howland and Baker 2020 03 12 00 2020 03 16 00 28.80 0.99 0.10 0.50 0.5 -176.5 Howland and Baker 2020 03 16 00 2020 03 19 00 28.80 0.97 0.10 0.50 0.5 -176.5 Howland and Baker 2020 03 19 00 2020 03 23 00 28.80 0.94 0.10 0.50 0.5 -176.5 Howland and Baker 2020 03 23 00 2020 03 26 00 28.60 0.72 0.00 0.50 0.5 -176.5 Howland and Baker 2020 03 26 00 2020 03 30 00 28.50 0.60 0.00 0.50 0.5 -176.5 Howland and Baker 2020 03 30 00 2020 04 02 00 28.50 0.58 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 02 00 2020 04 06 00 28.60 0.65 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 06 00 2020 04 09 00 28.60 0.63 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 09 00 2020 04 13 00 28.60 0.61 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 13 00 2020 04 16 00 28.60 0.57 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 16 00 2020 04 20 00 28.50 0.42 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 20 00 2020 04 23 00 28.50 0.38 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 23 00 2020 04 27 00 28.50 0.33 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 27 00 2020 04 30 00 28.50 0.29 0.00 0.00 0.5 -176.5 Howland and Baker 2020 04 30 00 2020 05 04 00 28.30 0.03 0.00 0.00 0.5 -176.5 Howland and Baker